Aura Minerals Inc. (ORAAF) Q2 2023 Earnings Call Transcript

Aura Minerals Inc. (OTCQX:ORAAF) Q2 2023 Earnings Conference Call August 8, 2023 9:00 AM ET
Company Participants
Rodrigo Barbosa - President and CEO
Kleber Cardoso - Chief Financial Officer
Conference Call Participants
Edgard Souza - Itau BBA
Victor Chen - Safra
Roman Rossi - Cannacord Genuity
Rodrigo Barbosa
Good morning all. And again, thank you for being here with us, so that we can explain and go through the quarter’s results. As we already predicted, now, we will go through. This was very important quarter for us, despite a weaker production that was already projected. We generated cash flows. We are moving significantly forward on the projects that I am going to share with you.
But first, going to the results and the production by itself. As we already released in early July, the production of this quarter was close to 48.500 gold equivalent ounces and that is lower than the first quarter mainly because of EPP when during last quarter we assessed lower grades.
This was already projected since the beginning of the years that we knew that this quarter would be weaker in EPP and that we will be reaching higher grades in Q3 and then Q4, significant higher grades.
I am going to show you that exactly what happened in 2021, in 2022. Now, in 2023, we should also have a strong Q3 and even stronger Q4. Not only by higher grades in EPP, but also with the -- we should -- we expect the start of commercial production for Almas very soon, plus a gradual increase in Honduras and stable production in Aranzazu.
Going -- so we maintained the guidance for EPP despite this weak quarter as it was already planned. Again, for those that are investing in Aura recently, mining gold different from other for iron ore, for example, sometimes you reach higher grades and lower grades. The grades are not very spreaded out equally on the site.
So sometimes, you will have higher and lower grades, so this is very common in gold companies, and of course, the more assets you have, this will be smoothed out and we are growing number of assets and producers. So we should be this movement smoothing out along the next years.
In San Andres, we had -- we continue to increase production. We continue to improve the productivity in the site. If I remind that everybody, the last quarter of last year, we produced close to 12,000 ounces, first quarter of this year, we produced 14,000 ounces and this quarter slightly over 16,000 ounces. So we are gradually improving and we should continue to do so, move to 18,000 ounces to 20,000 ounces of production now in Q3 and also Q4.
However, as we had a more challenging start of the year in San Andres, this ramp-up is according to our expectation, but we started at the lower range. So in the end, this will affect our production guidance for the year. So we are changing the guidance of the year for San Andres around the 10,000 ounces.
So now with the guidance is to be close to 60,000 -- between 62,000 and 69,000 ounces for the year, understanding then that we will continue to improve in the Q3. Q4 will be higher production -- should be higher production than Q1 and also Q2.
In terms of EBITDA, then Kleber will go more in details. We reached the $26.6 million, which is lower than less quarter mostly because of EPP that we reduce production by grades and San Andres will increase production and in Aranzazu now we are very stable as well.
In terms of all-in sustaining cash costs, we had a few different variables that affected the all-in sustaining cash costs. Number one, the lower production affected all-in sustaining cash costs. So it’s increased by 3% guidance on the middle of the range because of the lower production expected for the year in San Andres.
In the other hand, the devaluation of dollar against mainly peso Mexican and Brazilian reals, Honduras is more linked to the dollar. There was no significant devaluation. But in Mexico and also in Brazil, there was a devaluation of the dollar that also affects our cost and it increased impacted by projected for the year by 6%.
So we are reviewing the guidance of our all-in sustaining cash costs by -- on the middle of the range by 9%, being 3% due to lower production in San Andres and then 6% because of exchange rate. But as the metal should react once you have on the topline, if we increased the cost in U.S. dollars because of the valuation of dollars.
On the other hand, the gold and copper prices has also appreciated compared to what we had forecasted in the beginning of the year. So in the end of the day, either gold and copper is working against protecting the valuation of dollar and also inflation.
Despite this weak production that we projected for this quarter, when you see the results, we continue to have a robust cash flow from operations and that gave us an opportunity to fulfill our commitment to our shareholders to pay the dividends, which we paid $10 million in June as a dividend to our shareholders and now -- according to the Q3 and Q4 results, we should also be paying by the end of the year a new dividends as we are now committed to pay twice per year our dividends to our shareholders.
So if I -- we move a little bit from the results on the quarter and then we see what is happening on the projects or development on the value creations that we are doing to our shareholders during the quarter this was very important.
Number one, we finished -- in Q1 we finished the construction of Almas on budget and on time in a moment that the whole world was scarce of projects and labor, and many projects was delayed, we could fulfill our commitment to be on time and on budget.
Not only that, the ramp-up has been very satisfactory and we are already operating above nominal capacity in only less than four months to five months when we should be declaring commercial production for Almas very soon.
We are already operating in nominal capacity and also the recoveries on gold has been also above 90% -- 92%, sometimes 93%. So we are feeling very comfortable to declare commercial production very soon.
So Almas is going -- moving forward as expected and we should be delivering the results and commercial production soon and we will be added to the results in EBITDA for the second semester.
Number two, Borborema is also moving forward according to our expectations. We are about --wrapping up the numbers for feasibility study of this project and we should be announcing soon. Not only that, we already started some land works to prepare the site for -- to receive the investments. So we are closing the funding very soon to study to the construction [Technical Difficulty] And to the market as we move forward in the exploration process for our projects.
Before I get to the numbers, in terms of safety, very important, we continue in Q2 to have a zero lost time injury as we had in Q1 in -- either in Almas, in EPP, it’s been one year with no also lost time injury.
In terms of ability of the structures, we -- every month we have an external review on our job technical structures and all the job technical structures are audited by a third-party has been at the satisfactory level for our structures.
So when we compare on the left side of this slide, the production, we had the Q2 49,000 gold equivalent ounces. But as you can see in Q4 2021 and Q3 2022, Q4 2022, we -- once we reach higher grades, we will be increasing production by Q3 and then Q4. So we should expect now the lowest the last 12 months and then we start growing up in the upcoming quarters.
On the right side, as I mentioned earlier, we see that the decrease compared to Q1 production, gold equivalent ounces from 53,000 ounces to 49,000 came mostly and exclusively by EPP when we reach at the lower grade. So EPP came from 13% to 7% and then we should be reaching higher grades above, should they expect to be 20,000, 25,000 of gold production on the upcoming quarters, if not more.
In Aranzazu, we have very stable production, despite changes in the prices of gold and copper that affected negatively. The production was somehow increased so that some offset this lower production. So we are very -- even in terms of production Aranzazu, it is continued -- it should continue to be very stable.
In San Andres, again, we are coming from 12,000 ounces of production per quarter, 14,000 last quarter -- first quarter this year and then now 16,000 and this should be reaching 18,000 to 20,000 now of gold equivalent ounces in the upcoming quarters.
In terms of all-in sustaining cash costs, as you see in Q2, we had an increase compared to Q1. This increase comes from two variables. Number one, this is lower production in EPP, as we could see, 7,000 ounces and this will be reduced as we will increase the grades during Q3 and Q4. And the second variable is the devaluation of the dollar. So that also impacted our all-in sustaining cash costs, mostly EPP and then devaluation of the dollar.
So, in terms of the guidance and here we gave a lot of information, I am not going to go through all the numbers here, but everybody feel free to access this presentation that will be on our website.
I will give the main message that we are reviewing the guidance for the year for consolidated production more exclusively by the challenges we had in San Andres in the beginning of the year and the ramp up now, it’s at the lower -- started with the lower production.
But now it’s moving according to our plans and we should continue to increase. So we will be -- we are revising the guidance by 5% only for the year, despite the challenges that we had in Honduras.
That lower production in Honduras has impacted our all-in cash cost. We implemented significant measures to reduce cash cost and somehow offset the higher cost coming from lower production.
So if we use only the same exchange rate and compare our all-in sustaining cash cost is increasing by 3% only, while the production was 5% lower. And then we have the impact of exchange rate either in Brazil and also in Mexico. That impacted again additional 6%, as I mentioned earlier, in terms of our all-in sustaining cash costs. So now we are projecting the guidance for cash costs from $897 million to $973 million and all-in 1,162 and 1,261.
Understanding then -- now with either Almas, Borborema and Matupa, all of them has all-in sustaining cash cost below the average that we have today. So we should see the new projects coming in and moving these all-in sustaining cash costs at a lower production.
But these numbers already would put us on the second quartile. We want to be even lower, but the whole industry is moving up and we have been able to somehow control our cash cost to keep our company -- keep our -- at the second quartile.
In terms of CapEx, we had a previous guidance, $80 million to $93 million. Now we have $85 million to $95 million. We are already planning some expansion in Almas and some other mine development for Almas, so that increased a little bit, but we are aiming to achieve higher production in Almas very soon.
As I mentioned, we are very proud what is -- what we have been delivering in Almas. We already have over 1,000 employees, 55% comes from the very close area, 80% from the state and the regional state from -- we have been investing significantly in training local team.
We also took some of the managers to EPP to learn and they came back and they are running the -- this plant very, very satisfactory and they are contributing significantly for us to have this successful ramp up.
I would highlight again that we reutilized 100% of the water that is on the – then it come back to the production and occasionally due to evaporation, we will access water from the river, but that will not be more than 10% of the total water that we use.
The start of ramp-up was in April, 16 months, actually, it was 14 months, because the first two months we waited because of the heavy rains and now we are out, which is among the fastest plants to be in the mine to be built in the world. And two, now we are above the historical in terms of ramp up, also setting new benchmarks to the market once we should be declaring commercial production in the upcoming weeks.
So as we can see in the numbers on the left side, the production per week at the plant, so we are ramping up very fast since June. In late June, we already reached over 20,000 tonnes and then gradually improving and then now in July, above 25,000 tonnes, 26,000 tonnes and less or more 24,700 tonnes. Then the nominal capacity, it depends a little bit on the most, but it will be around 25,000 tonnes per week.
In terms of tonnes per hour, the nominal capacity is closer to 160 tonnes per hour. As you can see on the right side, in the last one week, two weeks, three weeks, four weeks, five weeks, six weeks, we are already operating above our nominal capacity in terms of tonnes per hour, which is now -- then we started increasing the grades and to see the reaction in the recoveries and now we have been seeing the recoveries at 90%, 92% or 93%, very much in line with what we expected. So that gave us comfortable to maintain and look carefully in the next two weeks and then declare commercial production if that continues to be very stable.
So, Kleber, I will turn the floor to you.
Operator
Excuse me, Mr. Cardoso. Could you please open your microphone?
Kleber Cardoso
Hello? Can you hear me?
Rodrigo Barbosa
Yes.
Operator
Yes. Please proceed.
Kleber Cardoso
Okay. Thank you. So, good morning, everyone. So now we are going to share a summary of the main financial results. On this page, we have -- we are bringing in the main financial KPIs, the company tracks.
We have the results for the current quarter and the last few quarters and accumulate it at the last 12 months at the end of each reporting period and in line with what Rodrigo was explaining was a more soft departure in terms of reduction mainly due to minus sequencing at EPP and we see that reflecting in the results of the quarter with revenues achieving $85 million and adjusted EBITDA $27 million at the second quarter.
Despite the challenge, we still reported a positive net income of $11 million on this Q2 and regarding the cash and net debt position of the company, we still ended the quarter with a strong cash position of $110 million, after paying $10 million in dividends in June and investing $21 million in expansion during the second quarter.
The net debt achieved $114 million at the end of this quarter and we would like to highlight again, this is probably we are seeing the peak in terms of the relationship of net debt and adjusted EBITDA. Now with almost very close to declaring commercial production, which is going to add additional cash and EBITDA for the company and also with improvements of grades at EBITDA in the next few quarters, we should see the trend changing with a reduction in net debt and improvement in the EBITDA.
Here we present an analysis showing the main items between the adjusted EBITDA and net income of the second quarter. As we saw previously, adjusted EBITDA was $27 million for the second quarter. We highlighted again the performance of Aranzazu has been consistently strong performance, both in terms of production, cash cost and also EBITDA was our highest EBITDA in the quarter, $18 million.
Another positive note on San Andres in the last two quarters because of the ramping up of production. The EBITDA was very low. Now it’s back to $11 million. Although it has not reached its full potential, but already at a positive note and EPP, $3 million in EBITDA despite the lower production due to mine sequencing.
Moving to the other items, amortization, depletion expenses at $11 million and financial results of $3 million came according to our expectations and pretty consistent with what we have seen in the last few quarters.
In terms of other results, the company is recording a positive $3.4 million gain in the second quarter, which is associated with a promissory note or has in its favor. The outstanding value of the promissory note is $12 million between principal and accrued interest, which we expect to collect this month of August.
Before or ahead recorded in its balance sheet $8.6 million associated with the expected receivable of this promissory note and now we are -- now considering we are very close to collecting it, we are recording the additional $3.4 million. But again, more than the accounting impact, the positive note is there will be a non-recurring inflow of $12 million to the cash of the company during this third quarter.
Net income tax expenses of $2 million, consistent with the results, bringing net income of -- to $11 million at the end of the quarter.
And finally, we bring again as every quarter a detailed analysis with the change in the cash and equivalents of the company throughout the quarter. On the far left side of the page, the cash position at the beginning of the quarter at $103 million.
In this left side of the page is what we call adjusted free cash flow to firm, which is the free cash flow to firm generated by the three mines in commercial production, not including investments in expansions of the business. That portion of the business despite a weaker part in terms of production we did generate $15 million.
Then in the middle of the charge, the investments for growth, we invested $7 million in exploration. As a reminder, this year of 2023 is the year we are investing the most in exploration to increase our reserves and our resources, the life of mine of the company, so we are seeing substantial investments quarter after quarter.
Expansion CapEx of $21 million, which is mainly related to the final phase of construction of Almas and capitalization of ramping up costs. This number should reduce significantly for Almas from Q3.
And more to the right side of the page, the financial items, proceeds from that of $30 million related to the ongoing liability management of the company and the dividend that we paid at the end of June, $10 million, bringing the cash position to $110 million at the end of the quarter.
And with this, we end our presentation and open to questions. Thank you.
Question-and-Answer Session
Operator
Thank you. [Operator Instructions] Our first question comes from Mr. Edgard Souza, Itau BBA. Please proceed.
Edgard Souza
Hello, everyone. Thank you for the question. So my first question is about Borborema. I know that you are still working on the feasibility study. But if you could give us some qualitative information about the projects, it could help. So are you already proceeding with preconstruction works at the site? When do you expect to start with the construction and how long do you expect the construction to take? And still on Borborema, if you could please provide some color on the expected timeline for the CapEx of the project. How should we model the CapEx for the project? I mean, which percentage of the total CapEx is expected to be disbursed in 2023 and in 2024? And then my second question on Honduras. Congrats for the stabilization of the production in Honduras. I think this is an important milestone for this operation. My question goes more in the -- to the medium-term. At which levels do you expect production in San Andres to stabilize ahead? That’s it from my side. Thank you.
Rodrigo Barbosa
Okay. No. Thank you. Thank you, Edgard. So first, Borborema, we cannot yet disclose the precise numbers. We are wrapping up the feasibility study. It’s coming in the next couple of weeks. So then we will be releasing all the financials of this project and then later on, we will file the full report on 43-101.
What I have been sharing and it’s very important to mention is, number one, we already -- and as you asked, we already started the land works preparing the site and we continue to do land works preparing the site for the investment.
We also ordered the mill, because the mill was the bottleneck in terms of delivery, that is would be -- what would be struggling if we were not ordering. So the mill will be delivered by the end of 2024. So then production coming in at the end of 2024, but mostly now in 2025.
In terms of -- we will also add because there is -- I saw there’s a question that from Roman about the CapEx. We are an inflationary pressures, right? We could see some of this movement inflationary pressures and also impact on exchange rates on the CapEx.
But as we did for Almas, we are working very hard in order to optimize the CapEx so that we can maintain or if not reduce what had a big river project earlier. So we are now in this direction. We already revised the mine plant so everything is coming together as we expected. And we will be releasing the feasibility study together with the pre-economic assessment of extension on production.
So all the feasibility study has been done for 2 million tonnes per year. However, as I mentioned to the market, this project has already close to 900,000 ounces of reserves, but could be double of this if we remove one road, few kilometers and also get more water access. So we are doing feasibility study with the 2 million tonnes with 900,000 ounces of reserves despite over 2 million ounces of our resources and reserves.
So -- and then on the year three or four, after we projected and we are already taking all the initiatives in order to ask and get more access to water and also to move the road. So we believe that in three years, they will be accomplished. So then the PEA, we will access our 3.5 million tonnes, more or less, of production on year three and year four and that will significantly also increase our gold production that year.
So this is coming in line and becoming very satisfactory and then the precise numbers, Edgard, we will be disclosing to the market in the next couple of weeks. And I ask you to stay tuned and then we also do a call with the analysts to explain in more detail about this project, which is very important for our growth path.
Then you asked about San Andres. San Andres, we should continue to increase production to 18,000, 20,000 gold equivalent -- gold ounces of -- per quarter. As you compare to 2021, we are now somehow lower average grades compared to 2021. So we should not see on running rates if we don’t expand capacity, with this capacity, we have already reached 80,000 ounces to 90,000 ounces of production.
We should not be at that level on the running rate as we are today. So we should be around 70,000 gold ounces to 75,000 gold ounces, 65,000 gold ounces, 75,000 gold ounces -- ounces of gold. However, we are doing now -- start some exploration in other areas to understand the potential to access higher grades.
And two, understanding the potential also for us to expand the capacity of the plant so that we could then increase ounces of production. But that these running rates at the capacity that we have now, that will be at the range.
Edgard Souza
Okay. Thank you. Thank you very much, Rodrigo and Kleber.
Operator
Thank you. Our next question comes from Victor Chen, Safra. Mr. Victor Chen, your microphone was activated. Please proceed.
Victor Chen
Hi, Rodrigo. Hi, Kleber. I don’t know if you can hear me.
Rodrigo Barbosa
Yes.
Kleber Cardoso
Yes.
Operator
Yes.
Victor Chen
Okay. Great. I am not sure if the camera is working, but I will go ahead. Thank you for taking my question, Rodrigo and Kleber. I have a question on Almas. Hi, Rodrigo, Kleber.
Rodrigo Barbosa
Yes.
Victor Chen
I have a question on Almas. I had a few technical issues. So sorry if a question is a repeat. But, so Almas is close to reaching commercial production and I’d like to know how is the operation ramping up, is everything according to expected and we have the production contribution for Almas for 2023. But I wanted to know what we can expect for the annualized production for Almas, if possible to disclose? And my second question is on Borborema, you guys mentioned in the release the longer than expected delivery times for ball mill, which is pushing the startup of Borborema to the beginning of 2025. I’d like to know some more detail on that, because it seems like this was not your fault, this was due to external factors. So I just wanted to -- for you guys to touch on that. And on the subject of the withdrawal of the 2024 production guidance, was this delay in Borborema the only factor or were there any other factors in that decision of the withdrawal of the 2024 production guidance? Thank you.
Rodrigo Barbosa
Okay. So first, Almas, yes, it’s actually the ramp-up, it is above our expectations in terms of the last three weeks, four weeks in terms of production and also recoveries. So that makes us very comfortable to think about the commercial production very soon.
Actually, we were expecting to do that by the Q3, as we projected, end of Q3, now we can push more to do this now in August. And so the production on Almas, the project and the feasibility take us on the annualized production of 50,000 ounces of gold to be yearly per annual production.
But as we could -- I mentioned earlier, we could see -- we already saw some opportunities to increase production, so we are now investing so that we can see what could be a higher production for next year. But yet, the 50,000 is the annual -- annualized production for Almas in the first three years, four years, but after expansion that can increase.
Then you mentioned about Borborema. The sole reason that the production is pushed to very early 2025 is the delivery time for the mill. That should be delivered by the end of 2024. Then you need to install, start some preliminary tests so that we can start the operation and the ramp-up in 2025.
The single reason that we would drill the projections for 2024 is exactly this. It’s only because of Borborema being delayed by two months or three months and we were projecting to start production by late 2024, now it’s early 2025. That’s the only thing that affect.
But also, we are reaching close to the 2024 guidance. We are now by the end of 2023 and -- but when we finish the result of Q4, then we will give the guidance for 2024 as we do an annual base. But the reason that we will drill is exclusively because of the Borborema lead time for the mill.
Victor Chen
Okay. Thank you, Rodrigo. Thank you, Kleber.
Operator
Thank you. Our next question comes from the webcast from Roman Rossi. Good morning and thanks for taking my questions. I have a couple, if I may. Regarding Borborema, you mentioned that you are expecting to make the investment decision shortly. Are you expecting to have the finance in place during 2023? Also, can you give us some more guidance on CapEx or how it compares to the existing technical report, particularly considering the FX and inflationary pressures?
Rodrigo Barbosa
Thank you, Roman. We cannot yet disclose the numbers. We are wrapping up. But as I mentioned, there was some inflationary pressure. There’s some impact on exchange rate on the CapEx.
On the other hand, we saw opportunities to optimize as we did in Almas. So we don’t see major changes compared -- in terms of CapEx compared to the latest number that Big River disclosed. But we also revealed the mine plan, so we also looked in other alternatives in order to optimize.
And most importantly, we also could see and we will prepare this plant and as we did with Almas, very flexible with the 2 million tonnes and then to increase to 3.5 million tonnes and more in the year three and year four. Then there was a second question you made that I forgot here. Can you -- did I cover everything?
Kleber Cardoso
Oh the hedges. Hedges?
Rodrigo Barbosa
Oh! Hedges. Yes. What we do, Roman, is as we did with Almas, we like to guarantee the payback of the projects. So in, Almas, we could see the payback on equity in one year and the payback on the full project, including the debt in two years. So then we hedged the first two years of production in order to guarantee that either their equity investment is going to have the return and also the debt is going to be paid.
And then we should apply the same logic to Borborema to guarantee the payback of this project at a reasonable levels of price of gold. We normally do hedges as our zero cost collars and that’s the idea that we are already exploring to do for Borborema.
In terms of funding for Borborema, yes, we should announce construction together with the funding guaranteed for us to proceed with the project. So that will be a full package that we are preparing with the feasibility studies funding and also the return to the product.
Operator
Thank you. [Operator Instructions] Our next question comes from Terrence Oglag [ph]. Can we speak about inflationary picture on operation, labor and for supplies and services?
Rodrigo Barbosa
We -- the inflationary pressure that we felt mostly was 2021, 2022 and 2023 it seems to be more. The impact we had on the cost was mostly because of the devaluation of dollars and we published the numbers in dollars, while part of our costs in reals in Brazil and part of the costs are in Mexican peso. But we don’t see very high inflationary pressures now along the year of 2023. Kleber, do you have anything to add?
Kleber Cardoso
No. Okay. I think that inflationary pressure in 2021, 2022, where we implemented also the initiatives to fight back inflation. What we are seeing is less inflation, more FX impact, the appreciation of the Brazilian real and the Mexican peso, which is on the other hand being partially caused by a weaker dollar, which is also contributing to the increase in metal prices as well. So other than that, I think, no major inflationary pressures.
Operator
Thank you. Our next question comes from Felipe Lahan [ph]. How is the debt amortization schedule being addressed, we see a significant amount to be paid off in less than one year?
Rodrigo Barbosa
Kleber?
Kleber Cardoso
Yes. So -- it’s our -- we work with local banks and with the different many banks in jurisdiction. Historically, we have had a significant portion of the maturities in the short-term that has been even improving in the last three years or four years, every year we have been able to push the debt a little bit longer by doing liability management with the local banks.
What we are doing right now, as we speak, we did some in Q2, I showed that we raised $30 million for the liability management. Just keeping the -- doing the same program, working with the local banks in each jurisdiction, so that we can take advantage of both the capital liability and the tax shifts and doing the liability management in each term that we do the liability management, we push the debt a little bit longer. That’s not a concern for us.
Operator
Thank you for the questions. Now I pass the floor over to Mr. Rodrigo for his final considerations.
Rodrigo Barbosa
Okay. So thank you all for the earnings call and we reinforced despite a weaker production. As we predicted for this quarter, we produced a healthy cash flows from operations that allow us to continue to invest and also the paid dividend.
As I reminded our case since the IPO we did in Brazil is to generate value to our shareholders by; number one, growing production and implementing the greenfield projects; number two, increase resources and reserves in all the mines that we operate; and then number three, while we can also pay dividends.
So we have been growing production. The project is being delivered. Almas is there? We started the ramp-up on time on budget and we expect very soon to declare commercial production. So we are moving forward with the Borborema project. Numbers should be coming in and published very soon and while we continue to develop Matupa.
So a long-term project, despite this 5% review on guidance, the long-term view in the company, it’s been very consistent and we reaffirm our guidance to be at the 450,000 ounces of gold equivalent production annualized by end of 2025.
So I thank you all and then I would invite you to stay aware, stay tuned. We hope to be delivering news in the upcoming weeks, important news as we were questioned here several times about Borborema and also about Almas. Thank you.
Operator
Thank you. We now conclude the Aura’s conference call. Have a nice day.