close

Torrent Power inks pact with Maharashtra govt to build 3 hydro projects

The projects would entail an investment of about Rs 27,000 crore and would provide employment to nearly 13,500 people during the construction period

BS Web Team New Delhi
Torrent Power

Torrent Power

Listen to This Article

Torrent Power Limited has signed a memorandum of understanding (MoU) with the Maharashtra government for the development of three pumped storage hydro projects of 5,700 MW capacity.
In a regulatory filing, the company said, “The projects would entail an investment of about Rs 27,000 crore and would provide employment to nearly 13,500 people during the construction period.”

Torrent intends to execute these projects over a period of 5 years.
The projects would be executed at three sites identified by Torrent namely Karjat (3,000 MW) in Raigarh District, Maval, (1,200 MW) and Junnar (1,500 MW) in Pune District. All the sites are off-stream and the projects are planned to provide a minimum of six hours of energy storage on a daily basis.  

The share of renewable power, which is intermittent in nature, is rapidly increasing in the grid. This necessitates energy storage for load management and meeting peak demand.
Pumped Storage Hydro is an established, proven, and cost-effective technology for firm, flexible and dispatchable power. PSH is a configuration of two water reservoirs at different elevations. Water is pumped to the upper reservoir at the time of excess power when it is the cheapest.

Also Read

Torrent Power to buy 1.1 Gw green energy capacity from ReNew Energy: Report

Suzlon Energy secures fourth wind energy project order in less than a month

Power stocks to stay charged as heat wave sweeps India, say analysts

Torrent wins race to acquire RCap with Rs 8,640 crore offer to lenders

Torrent Pharma Q3 PAT up 14% to Rs 249 crore riding on India, Brazil

Nassom releases normative guidelines on generative artificial intelligence

HC refuses to interfere with BoB's decision inviting EoI for NBL stake sale

Sidbi signs MoU with HDFC Bank to offer financial solutions to MSMEs

Ashok Leyland seeks pre-pandemic sales volume in FY24 with new launches

Tata Consumer biz to see high growth, open to acquisitions: Chandrasekaran


At the time of demand when power is expensive, water flow from upper reservoir to lower reservoir generates power with a hydraulic turbine. PSH is a much superior solution than Battery for energy storage as it is cheaper, has longer life of 40 years, provides longer duration storage of 6 to 10 hours with feasibility of multiple cycle operations during the day.
Torrent Power currently has an aggregate installed generation capacity of 4.1 GW, which consists largely of clean generation sources such as gas (2.7 GW) and renewables (1.07 GW). It also has a Renewable capacity of 0.7 GW under development. Torrent's growth focus in power generation remains on renewables.

Torrent Power, with a turnover of Rs 25,694 crore (about $3 billion), is the integrated power utility of the diversified Torrent Group with group revenues of Rs 37,500 crore (about $4.50 billion) and group market cap of Rs 87,000 crore (about $10.50 billion).

Torrent Power

  • 1D
  • 5D
  • 1M
  • 3M
  • 6M
  • 5Y
  • MAX

First Published: Jun 06 2023 | 8:52 PM IST

Explore News