Work on non-motorised corridor begins in Kovai in Coimbatore

The CCMC had proposed the NMT corridor as part of efforts to prevent accidents caused by motor vehicles and to make roads pedestrian-friendly.

Published: 03rd September 2022 01:25 AM  |   Last Updated: 03rd September 2022 01:25 AM   |  A+A-

Image for representation

Image for representation

By Express News Service

COIMBATORE: Works for the long-awaited NMT (Non-Motorised Transport) Corridor began on Friday, with officials of Coimbatore City Municipal Corporation (CCMC) inaugurating the project near the Town Hall. The NMT corridor is a pedestrian plaza where people can walk or use a bicycle.

The CCMC had proposed the NMT corridor as part of efforts to prevent accidents caused by motor vehicles and to make roads pedestrian-friendly. It roped in a German agency in 2019 to implement the project under the Smart City Projects mission.

After conducting multiple trials over the past few years, the CCMC has finalised four routes for implementing the project. These include Raja Street, Big Bazaar Street, Cross-Cut Road and Nanjappa Road. Sources in the Smart City mission said the routes have been selected based on pedestrian movement, and flow of traffic.

“In Big Bazaar Street, the NMT corridor will be laid from the Koniyamman Temple in Town Hall to the Athar Jamaath Masjid in the Oppanakara Street junction for which the works have begun. In Raja Street, the corridor will cover 375 metres from Five Corner to St.Michael’s School. Two routes are to be established in Gandhipuram - one starts from the Nanjappa Road junction to the Lakshmi Complex covering a length of 440 metres. And the other route will be laid for about 800 metres from the Cross Cut road to the Power House junction,” sources added.

In order to ease pedestrian movement and bar other vehicles from entering the NMT corridor, the CCMC will install bollards, signboards, and reflectors and paint the pathway with the necessary markings to make it stand out from the road. Also, CCMC will be asking all other departments to complete the water pipeline installation and other UGD works before starting the NMT project in order to avoid digging the roads, said the sources.

Speaking to TNIE, a senior official of the Smart City Projects mission said the project will be carried out at an estimated cost of Rs 7.5 crore under the Smart City Projects mission in about four packages.  “The delay was inevitable as a few of the design concepts were in the finalising stages. The project will be finished in 120 to 150 days” the official added.


India Matters

Comments

Disclaimer : We respect your thoughts and views! But we need to be judicious while moderating your comments. All the comments will be moderated by the newindianexpress.com editorial. Abstain from posting comments that are obscene, defamatory or inflammatory, and do not indulge in personal attacks. Try to avoid outside hyperlinks inside the comment. Help us delete comments that do not follow these guidelines.

The views expressed in comments published on newindianexpress.com are those of the comment writers alone. They do not represent the views or opinions of newindianexpress.com or its staff, nor do they represent the views or opinions of The New Indian Express Group, or any entity of, or affiliated with, The New Indian Express Group. newindianexpress.com reserves the right to take any or all comments down at any time.