Jeypore airstrip project gains steam as technical team oversees progress

At present work on construction of category 2 C runway is in progress at the airstrip.

Published: 08th August 2021 03:50 AM  |   Last Updated: 08th August 2021 07:30 AM   |  A+A-

The team from BPIA inspecting the runway at Jeypore airstrip | Express

By Express News Service

JEYPORE:  With the State government’s announcement on commencement of operations from Jeypore and Rangeilunda airstrips on Friday, a three-member technical team of Biju Patnaik International Airport (BPIA) is camping here to oversee the airstrip expansion project as per instructions of the Union Ministry of Civil Aviation. 

The airstrip apart, work on type two B category runways, 915 metre in length and 23 metre in width, has already been completed at a cost of Rs 14 crore by the PWD but is yet to be approved by the Civil Aviation Ministry. Sources said the PWD has also completed construction of control rooms and guest rooms at the airport. The technical team, led by AGM SK Sahu, is checking required infrastructure at the facility like the traffic signal system and construction of buildings at the airstrip, said PWD executive engineer Bhaskar Chandra Samantaray. 

At present work on construction of category 2 C runway is in progress at the airstrip. While Rs 55 crore has been sanctioned for the expansion, the PWD will spend Rs 38 crore for construction of runway and other infrastructure at the upcoming facility. Once completed, the type 2C runway will be 1,200 metre long and 30 metre wide.  

However, the expansion has not been able to make much headway owing to the Dhanpur distributary of Upper Kolab irrigation project in the area. The authorities can carry out further work on the runway only after flow of water in the project canal is stopped. “We expect the expansion work to be completed by June next year,” said a senior engineer working on the project. 

Flight services from these airstrips will be started by the State government’s own initiative and not included in the UDAN scheme of Centre, Transport Minister Padmanabha Behera had said. The decision was approved by Chief Minister Naveen Patnaik. The Minister had said that flights will operate on routes like Jeypore-Vizag, Rangeilunda-Vizag in the first phase.


Comments

Disclaimer : We respect your thoughts and views! But we need to be judicious while moderating your comments. All the comments will be moderated by the newindianexpress.com editorial. Abstain from posting comments that are obscene, defamatory or inflammatory, and do not indulge in personal attacks. Try to avoid outside hyperlinks inside the comment. Help us delete comments that do not follow these guidelines.

The views expressed in comments published on newindianexpress.com are those of the comment writers alone. They do not represent the views or opinions of newindianexpress.com or its staff, nor do they represent the views or opinions of The New Indian Express Group, or any entity of, or affiliated with, The New Indian Express Group. newindianexpress.com reserves the right to take any or all comments down at any time.