NTPC Limited shall discontinue operations of Talcher Thermal Power Station, Odisha having a total installed capacity of 460 MW.
“After running for 54 years, operations of Talcher Thermal Power Station, Odisha having total installed capacity of 460 MW shall be discontinued w.e.f. March 31, 2021,” the company said in a regulatory filing on Tuesday.
At around 10.44 am, NTPC Ltd was trading at Rs108.20 per piece up Rs0.50 or 0.46% from its previous closing of Rs107.70 per piece on the BSE.
Related Tags: