Seeking Alpha

Vedanta Ltd (VEDL) CEO Sunil Duggal on Q2 2021 Results - Earnings Call Transcript

|
About: Vedanta Limited (VEDL)
by: SA Transcripts
Subscribers Only
Earning Call Audio

Vedanta Ltd (NYSE:VEDL) Q2 2021 Earnings Conference Call November 6, 2020 7:30 AM ET

Company Participants

James Cartwright - Head, IR

Sunil Duggal - CEO

Arun Kumar - CFO & Whole Time Director

Ajay Kapur - CEO, Aluminium & Power business

Conference Call Participants

Amit Dixit - Edelweiss Securities

Sumangal Nevatia - Kotak Securities

Indrajit Agarwal - CLSA Limited

Ritesh Shah - Investec Bank

Pinakin Parekh - JPMorgan Chase & Co.

Raashi Chopra - Citigroup

Amit Murarka - Motilal Oswal

Operator

Ladies and gentlemen, good day, and welcome to Vedanta Limited Q2 FY '21 Earnings Conference Call. [Operator Instructions].

I now hand the conference over to Mr. James Cartwright from Vedanta Limited. Thank you, and over to you, sir.

James Cartwright

Thank you very much, operator. Good evening, everybody, and thank you very much for joining Vedanta's second quarter report. On the call today, we have Sunil Duggal, our group Chief Executive Officer; Arun Kumar, our Group Chief Financial Officer; and Ajay Kapur, our Chief Executive Officer in Aluminum and Power.

With that, I'd like to pass over to Sunil to start today's presentation.

Sunil Duggal

Thank you, James. Good evening, ladies and gentlemen. Let me first focus on the big picture. Let me start by passing on my deep gratitude and thanks to all our employees, who have worked tirelessly to deliver another strong operating quarter for our company.

Through a challenging environment, over the last 6 months, we have continued focus on cost discipline and efficiency has allowed Vedanta to emerge stronger and more efficient than ever. Thank you, my friends. As ever, should adversely also comes opportunity. These numbers confirm that Vedanta is on track to deliver the acceleration in its results and resource base over the coming quarters. We have confidence in being able to deliver the best from our assets and people, whilst always being committed to our core values around safety, environment and social responsibility.

Now turning to some key takeaways from our second quarter results. Resilience and efficiency despite turbulent macro environment and volatile commodity market, we posted a solid operating performance with improvement across our key verticals. In fact, quarter two EBITDA is the highest operating results achieved for more than two years now. Even more so, this has been achieved in what can still be seen as a challenging environment.

This quarter, commissioning record production volumes in multiple segments with Zinc, touching the milestone of highest ever ore production and the quarterly silver production, while achieving the lowest cost levels since transitioning to underground mining. Our aluminum business continued with exemplary performance with quarter 2 '21 cost of production on down 30% Y-o-Y at $1,288, both our smelters in Jharsuguda and Balco are in the first quartile of the cost curve for calendar year 2020.

The aluminum production at Lanjigarh for the quarter stood at 462 kilo tonnes, up 13% year-on-year, with Lanjigarh cost at $227 per tonne, down 23% year-on-year. Our Zinc International business saw a 33% increase in production Q-o-Q with production ramping up in Gamsberg. I'm happy to share that, we recorded highest ever production in Gamsberg in October at 17.1 kt as we are inching to work design capacity now. In our oil and gas business, our continued focus on operational excellence has enabled us to deliver operating cost at $7 per barrel, while the gross oil and gas production for the quarter was 165,000 barrels per day as compared to 159,000 barrels per day in quarter 1.

In our steel business, we have had a sharp rise in margins quarter-on-quarter with October margin moving up to triple-digit at more than $100 per tonne. Our key growth projects are back on track. And as ever, the expansion is being delivered through strict capital allocation and balance sheet focus, aimed at creating value for our stakeholders. On our financials, we achieved an EBITDA of INR 6,531 crore, with a robust margin of 36%. As I have said, this is the highest quarterly EBITDA result for more than 2 years and is testament to the strength and resilience of our business. Attributable pre-exceptional, pre-dividend PAT is INR 1,979 crore, up 75% Q-o-Q. Our balance sheet continues to be strong, with net debt-to-EBITDA at 1.2. We will talk more about business performance and financials in the upcoming slides. But before we do, I would also like to highlight some of the new initiatives we have been implementing across the group since my appointment, much of which involves the digitization and use of technology to drive operational performance, accountability and growth.

Vedanta Spark is a global open innovation platform that was launched very recently. It aims to partner with a wide variety of niche global start-ups to address opportunity across 16 business teams and 75-plus innovation challenges. The focus is on leveraging start-up innovation to drive higher operational efficiency as well as using technological solutions to benefit everything we do across health, safety, environment and sustainability.

Asset optimization and asset performance management. Vedanta is now deploying predictive analytics in its critical effect across mining, smelting, oil and gas operations. Through the use of big data, these tools help predict the end affect expected performance ahead of time, allowing improved maintenance duals and uptime, set optimization continues to be standard technology deployment across the group with the aim of having real-time visibility to track and improve group asset optimization KPIs. The impact is far-reaching from production optimization to sustainability and waste management.

Digital commerce for metals. Vedanta has recently gone live with an e-commerce platform for drink business and is now embarking on moving to a fully online sales platform for all its metals. This will bring transparency, reduce cost and greatly enhance our offering across our different customer segments.

We, at Vedanta, have always believed in the transformational approach to improving our performance. We have rewarded our marketing and commercial content into an integrated structure, enabling us to simplify the buying and selling organization, creating 4 category expertise and unlocking greater efficiencies. The integrated function will act as a group captive center in charge of all buying across commodities, spares and services and will be responsible for marketing and market development, while bringing in best practices in contracting operation planning and supply chain, digitization and e-commerce. With this transformational, we look forward to unlocking significant value for the group under the leadership of Mr. Sharad Garia, our Group Chief Commercial Officer. These are just some of the measures we are implementing. All of these are aimed in better positioning ourselves to leverage our scale and synergy with cutting-edge technology, assess performance, integrity and safety as we embark on this next phase of growth.

Now I come to macroeconomic environment. Before we move on to the performance in detail, a quick glance at the macro environment. Since end March 2020, we have been passing through an unprecedented period due to the COVID-19 pandemic. Some months later, I am pleased to say that greater -- or better management protocols, disease and preventive measures have enabled us to operate at full capacity again. This, coupled with government policy measures have helped contribute to the resilience we have seen in much of the Indian economy. I thought it worth highlighting a few points here. Manufacturing PMI recorded fresh areas high in September '20 at 56.8% from the grow of 27.4% in April 20. Passenger vehicle sales in July to September registered 17% growth. Steel production has grown every month-on-month since May, export also bounced back pre-COVID levels in September, narrowing the trade deficit.

Prices of metal like zinc, aluminum, copper, led and silver surpassing pre-COVID levels, ramped by massive fiscal and monetary measures adopted by developed countries like U.S., EU and Japan. Oil prices have rallied to back to about $40 per barrel although structural supply demand concerns make keep prices subdued for longer duration.

Likewise, we run our business assuming downside risk continues. Prudence means price should come back on the pressure with the resurgence of coronavirus cases and additional lockdown measured in Europe and elsewhere in the world. Counterbalancing that we highlight the general resilience being seen in global emerging markets. We note the strong performance in China's GDP, which registered 4.9% in quarter 3 2020. The steady growth in industrial production in China is also expected to augment commodity demand.

Now coming to safety, environment and sustainability. Moving on to health and safety management. Throughout the COVID-19 pandemic, our focus has been to maintain business continuity while ensuring employees, business partners and communities remain safe. Following all government guidelines, we have also deployed an internal business task force to closely monitor the situation on the ground. We have recently launched a dashboard from tracking of the number of solid cases across the group. We have also completed internal and external benchmarking to ensure we are following the best-in-class COVID mitigation norm and continuously meeting or exceeding the government requirements. We began this fiscal year with a strong commitment to improve our CFT performance, while there have been significant gains made across our businesses, and all our businesses are implementing continuous improvement program to achieve our vision of 0 harm, we are deeply saddened by the loss of 3 lives in this quarter. We have completed the in-depth incident investigation for these fatalities. The learning from the incident are being reviewed with all our employees and business partners for implementation across all our BUs. The of the actions from lesson learned will be tracked and monitored at our Exco level.

Now coming to Environmental Sustainability Management. On environment management, our focus remains on tailing dam risk assessment, monsoon preparedness of our tailings and waste management facilities and monitoring high-risk noncompliances. These aspects are being continuously monitored at group and BU exports.

On carbon, FY 2020 was the end of cycle of our gig emission intensity, reducing target we have we managed to use our gig emission intensity by nearly 14%. Since then, we have further reduced our emission intense, and the number of now stands at 16.65%. This reduction is equivalent to 10 million tonnes in avoided emissions. We are currently in discussion to set up long-term emission reduction target FY 2030 for the business. The carbon product, which is FX body on setting up the carbon agenda is deliberating the optimal target that are in keeping with the global expectation and business reality. In cognizance of the importance of this subject for the company, we have appointed a director carbon and social performance, who will drive this agenda. I would also like to highlight the release of our 12th annual sustainability report that is now available on our website for all to read.

Now come to our business verticals. Hindustan Zinc, Lead and Silver. During the quarter, our mine metal production was up 9% from a year ago to 238 kt on account of higher work production. Sequentially, mine metal production grew by 18% supported by higher ore production resulting from better mine planning, effective targeting with increased use of technology. However, this was partly offset by decline in metal grades and lesser ore treatment. Integrated metal production was 237 kt, up 13% from a year ago and 18% sequentially, in line with availability of mine metals with zinc at 180 kt and led at 57 kt. Salable silver production was 203 tonnes, 51% Y-o-Y and 73% sequentially due to increased operation of better grades at our SK mine and have concentrate inventory.

Now come to zinc international. Turning to Zinc International, we witnessed increased production in the Gamsberg mine at 35 kt, up 38% Q-o-Q with recovery on an upward trend, increasing by 9% from Q1. Initiatives are in place to increase plant efficiency and output. BMM produced 15.6 KTIC in quarter 2, an increase of 30% Q-o-Q, supported by efficient COVID management and production initiatives. Significant production improvement initiative like old ore recovery, lower ore body recovery and broader efficiency initiatives are being carried out to increase production.

Coming to oil and gas. Gross oil and gas production for the quarter was 165,000 barrels per day as compared to 159,000 barrels per day in quarter 1 FY '21. Our continued focus on operational excellence has enabled us to deliver operating cost at $1.07 per barrel. We have completed the drilling work program this program added gross volume of over 10,000 barrels per day. The new gas terminal is ready and the gas has been introduced in the terminal law. We expect sales to commence from December. The commissioning of this gas terminal has increased our gas production from around 135 million scuffs per day to 240 million scuffs per day.

In Aishwariya facility construction as well as when hookup shall get completed in quarter 3, and this shall increase our production from current 7,000 barrels per day to 15,000 barrels per day. We shall also complete the polymer injection Bhagyam & Aishwariya, leading to full field polymer injection to increase recovery rates. Mangala processing terminal upgradation project has also get completed during the quarter, leading to incremental volume handling capacity by 30%.

In older blocks, we have completed FTG, Tata acquisition in Assam and Cambay. Our current efforts are focused in Rajasthan block under Ola, provide any monetization opportunity. Hence, based on Tata we are commencing drilling of wells in Rajasthan in quarter 3. This shall be followed by drilling in Assam and Cambay in quarter four.

Now coming to Aluminum. In our Aluminum business, which saw a strong quarter in terms of our alumina and aluminum production cost. The COVID-19 business impact has started to subside now. Likewise, we are in regular conversation with our suppliers and customers, all of which also see similar positive trends in market. Through continued team effort, we continue to run our supply chains well and expect supportive trends to continue. Our Aluminum sales performance for quarter 2 stood at 469-kilo tonnes. We dynamically altered our production mix during the quarter 2 exactly meet our customer requirements. Quarter 2 saw lower cost of production at $2.27 due to benefit from improved plant operating parameters and improved conversion costs.

On Aluminum, our quarter 2 hot metal cost of production is one of our best performance, standing at $1,288, 30% lower year-on-year. For our long-term raw material security, Vedanta bid for in the recently held 11 tranche core mines e-auction under the coal mines at 2015. We won this with a bit of 21% revenue sharing. The ore mine is in the state of is Orissa, fully explored and has total reserves proved plus indicated, of approximately 312 million tonnes and 6 million tonnes per annum capacity. This has the potential to meet our core requirement for the group, especially for Power Venetia, at aluminum smelter and in addition to presenting commercial sales opportunity. Our power costs saw significant reduction as Cool India reduced auction coal prices. This was aided by improvement -- improved input commodity prices as well as power regulatory costs.

We have refocused our entire aluminum operations for manufacturing and commercial excellence through a dedicated program, project that targets our cost and margins as a KPI. Now coming to iron, ore and Electrosteel. Turning to iron ore first. Our sales in Karnataka were at 1.3 million tonnes, significantly up Y-o-Y, while our pig iron production went up 6% to 186 kilotons. In Goa, we have continuously engaged with state and central government with the support of people adversely impacted by the Supreme Court statewide ban for the resumption of Our Electrosteel plant saw lower production, down 3% in quarter 2 Q-o-Q, primarily due to COVID, but the EBITDA margin improved significantly due to stronger steel prices and high focus on which was 71% versus 44% Q-o-Q, amidst domestic demand opening up. During the quarter, we achieved lower ever cost of $349 per tonne, supported by lower input commodity prices.

Now coming to strategy to announce long-term value. Before I hand over to Arun, let me reiterate our strategic priorities to drive long-term value for all stakeholders: one, ethics, health and safety and our social license to operate; two, expanding our reserves and resource base in a sustainable manner; three, continued track record of delivering value-adding growth in all our businesses; four, strict capital allocation and balance sheet focus; five, delivering the best from our assets and people.

Now I hand over to my friend, Arun for his presentation.

Arun Kumar

Yes. Thanks, Sunil, and good evening, good morning, everyone. I'm on the first page, financial snapshot. As we observed so far, these numbers represent a good comeback and expect the operating environment, both in terms of the mix -- global economic bond trajectory as well as the supply chain impact given the pandemic. The operational performance, both year-on-year as well as quarter-on-quarter shows a significant growth in bottom line driven by significant structural cost improvement as well as moderate volume pickup. demonstrate improved production and cost record silver recoveries. Aluminum, as you can see, is the third consecutive quarter where the costs are around or below the 1,300 mark per tonne of hot metal. And had a design capacity as we exit quarter 2. In fact, October month production was in excess of 17,000 tonnes.

Oil and gas is again slated to deliver a better H2, just like zinc, aluminum as the projects come online. The guidance for FY '21 is given for the first time this year in the annexure.

The headline numbers, our EBITDA at INR 6,331 crores, highest in 10 quarters, up 45% year-on-year and 63% sequentially. Margins, about 35%, again, highest in last 10 quarters. Net debt-to-EBITDA continues to be robust at 1.3 to 1.25 range on a consolidated Vedanta limited basis.

Attributable fee exceptional pre-dividend tax PAT at INR 1,979 crores is up 75% year-on-year. A detailed income statement is available in the appendix. Everything along expect with a few key points that I'd like to highlight as below. Depreciation reduced year-on-year, majorly due to the impairment of oil and gas in quarter four FY '20 saw a lower base. Quarterly depreciation for H2 is likely to be around these levels, maybe marginally upward by us given the higher predicted production in Hindustan Zinc and oil. The finance call reduced marginally, again in line with the softening trend of the interest rate environment. H2 quarterly trend is likely to be marginally higher.

Investment income declined year-on-year as well as quarter-on-quarter due to significant mark-to-mark positive movement in both those quarters. This particular quarter the interest rate movement has been fairly flat the yield curve in India. The underlying earnings are around 6% pretax on the investment surplus. That should continue for the rest of the year. During the quarter, on the tax line, there was a onetime tax charge of about INR 1,200 crores, primarily due to the dividend income offset against the carried forward tax losses, thus releasing from the deferred tax assets from the balance sheet. So pretty much, I would say, deferred tax accounting. It's book entry. The normalized ETR is 29% excluding the stack that we spoke about. And the full year guidance is also around 29%, 30%, has been fairly consistent even last year around the same level. So that's the guidance on below the EBITDA lines as usual.

Now I'll move on to the next page, EBITDA bridge year-on-year. As you can see, the price of fix currency and the cost story all the way as we held and improved volumes marginally. The structural strength in aluminum business was well over INR 1,000 crores of operational cost improvement along the benefits of input deflation, notably coal comes through prominently on this stage. Margin improvements in iron and steel, lower cost in oil and gas all show up.

Moving on to the next page on the sequential EBITDA bridge. Again, self-explanatory as the price recovery was quite sharp this quarter. But more importantly, volumes were back at normal. The share of domestic sales went up reflecting on the realizations and yet cost stayed where they were with the Aluminum business squeezing out some more costs this quarter. This is a good and strong comeback that I referred to at the start of the briefing.

Turning over to the net debt walk page. Net debt-to-EBITDA was maintained at a low level of around 1.2, again, on a consolidated Vedanta limited basis. And net debt as an absolute number remained flat quarter-on-quarter around INR 27,000 crores. Strong cash flow from operations were driven by high absolute level of EBITDA and a controlled low CapEx spend. On working capital, inventory liquidation was offset by supply obligations arising out of our prepaids, basically what I would say, timing differences and should plug back typically in quarter four when new contracts come in, in the new year -- calendar year.

The FACOR acquisition, a small synergistic steel business as part of the IBC process has now been completed. And it involved an upfront payment of INR 56 crores and the debt of about INR 280 crores represented by 0 coupon debentures redeemable in 4 equal installments starting from March 2021. We hope to make a success out of these acquisitions just like Electrosteel.

On the intercompany loan, INR 1,562 crores or $200 million were extended during the quarter. And more post the quarter end, which wins to the total outstanding capped amount on 956 million with an average maturity of 2.2 years, and hence, lower than the 1.05 billion reported at the end of quarter 1. Our repayment schedule is further enclosed in the annexure. The loans were extended primarily as part of cash management activities of the overseas returning better rates and liquidity. The next $207 million will be repaid by June 2021 as the sales as originally committed in the quarter 1 release, refer 301 was the total outstanding. And the balance will essentially be about $300 million repayment every year.

Moving on to the next page on balance sheet. Our key focus on the balance sheet management was to refinance maturities, while also extending the maturity profile. And we expect to close the calendar 2020 with close to about 3.8 years of average maturity. We are already at about 3.5. Broadly, as you see the bar about, FY '21 is largely all clear. Credit rating at AA- level stable. And we hope that with the improving operations profile, we can reengage agencies to get back into the upgrade triggers. The interest cost and investment income rates are in line.

The last page on CapEx guidance. We continue to allocate capital wisely. And the focus this year has been on preserving capital while we complete ongoing products in oil and gas. Full year guidance would be $0.6 billion, lowest in the last 5 years with an optionality of an additional $1.1 billion around the alumina refinance.

Future growth trends around Hindustan Zinc beyond 1.2 PPA and for Phase II or refinery Skorpion, completion of the steel capacity, alumina refinery, oil ASP and exploration will all be updated in quarter four, depending on the feasibility and progress, if any, in each of those projects. The objective of this year will be to deliver significant cash, strengthen the balance sheet, take care of debt maturities and invest wisely in growth capital that can increase profitable volumes across business verticals. Thank you, and back to Sunil for his final comment.

Sunil Duggal

Thanks, Arun. Let me take this opportunity to state again that Vedanta is uniquely positioned as one of the largest diversified natural resource business in the world. Our businesses benefit from the abundant mineral resources that India and Africa has to offer.

On the balance sheet, we stay focused on debt management. We continue to manage the maturity profile proactively as well as staying ahead of the regulatory and market changes.

Now key investment highlights. We believe the opportunity ahead for Vedanta remains incredibly exciting. Our large-scale diversified portfolio with attractive cost solutions in the core businesses, position us well to deliver strong margins and cash flows through the commodity cycle. India is Vedanta's core market and one which has huge growth potential. We are strongly and uniquely positioned to benefit from this growth. With our earlier investment, driving our cash flow, we have a strong pipeline of self-funded, high-return growth projects to further solidify our leading positions across our portfolio.

We are consistently striving to improve our operations, integrate our businesses through the value gain and optimize our performance through operational efficiencies and innovative technology solutions.

Before we wrap up, a quick summary on the guidance for the year which can be referred to in our presentation. Zinc India, we have already guided our MHC and finish metal production at 925 to 950 kt and silver at 650 tonnes this year, at a COP of less than $1,000 per tonne. Zinc International, we expect production at 150 to 160 kt at a cost of $1,200 per tonne, while BMM is anticipated to clock around 65 kt this year.

Oil and gas, gross volume is estimated to be 170,000 to 180,000 barrels per day from the year at a cost of $7.50 per barrel. Exit rate production is expected at 190,000 to 195,000 barrels per day. Aluminum metal production is expected to be around 1.9 million to 1.95 million tonnes for the year as a whole, while the alumina volume is estimated to be between 1.8 million to 1.9 million tonnes. We expect our hot metal COP to be between $13.00 to $13,50. Iron ore volume at Karnatka is expected to be around 4.8 million tonnes. Steel, hot metal volume at ESL is expected to be around 1.3 million tonnes.

With that, I would like to thank everyone for joining this call and open the call for question and answer.

Question-and-Answer Session

Operator

[Operator Instructions]. The first question is from the line of Dixit from Edelweiss.

Amit Dixit

Congratulations for a good set numbers. I have a couple of questions. The first 1 is on intercompany loan. So far, it is $956 million, I mean, are you in a position to confirm that it will remain at $956 million? Or is there a chance of it increasing further as a part of your cash management activities?

Arun Kumar

Yes. It will remain at $956 million, and it will keep coming down as for the repayment schedule.

Amit Dixit

Okay. Sure. The second question is on the impairment charge that you took in oil and gas in Q4. Now with things recovering, your own production has also recovered, as the production uptick and realization has also gone up. So do you envisage the reversal of this impairment? If so, when can we expect that?

Arun Kumar

If you look at the quarter four as well as the annual report, the details should be given in the sense that the oil prices that resume for this year and the next year are -- and the long-term average is probably around 52 to 54 range, right? So these prices were the main reason why the impairment was taken. And hence, once we have consensus reports which are well and above better price range. And perhaps it is still some time away to get to that level. It's not because oil went down to 30 on a particular day that the impairment was taken. So all those detailed assumptions we have shared there. And our own sense is that it will all depend on the consensus price estimates.

Of course, having said that, you will have noticed in Sunil's briefing that he talked about certain capital that could potentially go into Rajasthan exploration also. And in one of the charts, the OALP exploration is also covered. So any success for Rajasthan exploration increasing the results can theoretically lead to a write back, including on the gas side, which we hope with the surface facilities, whether the itself can produce more and get the results we all the future events to take note of.

Having said that, in the past, probably FY '18, we also had an impairment reversal. Technically, it is possible, but it depends on all the assumptions, reserve position and the price position in the future.

Operator

The next question is from the line of Sumangal Nevatia from Kotak Securities.

Sumangal Nevatia

So first question is continuing with the previous question on ICD. I just want to ensure beyond what levels one would require shareholder approval? And secondly, what sort of security of collateral have we seek from BRL for the protection of Vedanta minority given the high leverage and high risk at VRL?

Sunil Duggal

I think two things. One is the intercompany loan that has already been extended, is from the overseas subsidiary, oil subsidiary with And all the regulatory conditions have been completely adhere to there and did not need shareholder approval nor the Board approval of Vedanta Limited. It did have the independent board approval of CRHL. And as I mentioned in the previous answer, it is now limited to $956 million and will start coming down from here as per the repayment schedule. And hence, the limit will not go up nor will the loan not go up.

In terms of security, as again disclosed in annexure also in the quarter 1 results, this is unsecured in nature. There is no security that was felt required in this transaction, though it carries an attractive, which is why it carries an attractive coupon of 7%, and hence, can be earnings accretive to Vedanta Limited as a legal entity or at a consolidated level.

Sumangal Nevatia

Understand. Next question is on the dividend. Considering our policy on Hindustan Zinc dividend, so we have so far passed on approximately 1/3 of what we have received in the last two dividend. So is it possible to share what is the plan for future dividend payout? Do you want to stick to our policy?

Sunil Duggal

Yes. The dividend policy was same in 2015. Same is absolutely available on our website, and I would encourage another download and a reread of the same. The dividend policy would clarify that there are various scenarios where a normal dividend pass-through wouldn't necessarily occur in scenarios where there are prolonged strikes, lockouts, natural calamities, when prices fall sharply of the LME and other such situations are listed out there. And finally, of course, it is also commonly known, it is a matter of the Board decision as to the As well as what we term a special dividends also is a decision of the Board on a case-to-case basis. So with that, I would refer it to the visible and advice of the Board in terms of passing on the dividends in the future. But yes, the past trend has been that the Board has taken those decisions so it will vary from year-to-year depending on the main liquidity and the circumstances.

Sumangal Nevatia

Understood. So just a follow-up. In case we don't pass-through, we will have a tax liability on that. Is that the right understanding?

Sunil Duggal

As per the tax rules around dividend, there are 2 things that happen. On a book basis, dividends suffer minimum alternative tax liability, if you are on regime. And Vedanta so far has had a tax shield even on MAT. In terms of the normal tax computation, which is the nonbook tax, it gets a set off versus the pass-through based on section 80N. So we will always -- at any point of time, we also optimize to see that there is no tax suffering. So far this year, where we would have achieved that at this point of time. But yes, theoretically, any dividend received will be subject to MAT, as long as you are in the MAT tax regime.

Operator

[Operator Instructions]. The next question is from the line of Indrajit Agarwal from CLSA.

Indrajit Agarwal

Two questions from my side. First, on alumina business, the guidance of 1,300 to 1,350 for the full year implies about $100 per tonne higher COP for the second half. So which hedge do you think that the cost could go up? And what are you going to mitigate?

Sunil Duggal

Ajay, since you're here, please go ahead.

Arun Kumar

Ajay Kapur?

Operator

Ajay Kapur sir, please unmute the line from your side.

Sunil Duggal

So if I may up, see, the cost is more like dynamic in nature and there is some hedging cost involved also. So if the commodity prices look up, we have taken a margin that this could happen because of that. And secondly, although we have been able to secure the coal up to quarter 3 and going forward also, some coal for quarter four is also being secured. We are hopeful and internally, we are hope that we should be able to control the cost at the current level. But just as a guidance -- as a abundant precaution, we have given the guidance, which could be -- and our actual cost could be much within this cost.

Ajay Kapur

Yes, Sunil, I'm back. So I think more or less, what you have said is I agree fully. And for the guidance purpose, we are always more conservative. Having said that, some part of our cost is the imported alumina, where as the LME goes up, the alumina generally tends to follow the and there could be some cost escalation there besides, of course, the exchange rate. Other than that, I think, operationally, we are more or less in the right trajectory, and I'm very confident we should be able to maintain it.

Indrajit Agarwal

Sure. That's helpful. Second question, again, on the capital allocation. I just want to understand, is there any restriction or clauses which restricts us to upstream the cash at CISL to the Vedanta Limited entity here in India? The reason -- could you have used this cash to release the pledge on its shares or any other debt treatment at the Vedanta Limited level?

Sunil Duggal

Yes. So technically, the way to upstream the cash from CIHL to Vedanta Limited, the dividends or buyback of shares by CIHL. And if you refer to FY '20, we have done it during the year FY '20. So the best use of the cash pools or treasury cash flows at various legal entities would depend on the need as well as the attractiveness at various points of time. And since you mentioned about the Hindustan Zinc share pledge, that is -- it is not a share pledge loan just to clarify. It's not a margin loan. It is absolutely regular loan which is secured by the normal fixed asset cover which anybody else has.

Since the negotiation happened during the peak of the pandemic time, we could say that slightly different terms negotiated and perhaps expected. And it is our pleasure to do business with State Bank of India, the country's biggest and most prestigious bank and a fantastic set team there who have been very supportive during the [indiscernible] Vedanta. And hence it's an additional security given only. So I would say that it also has prepayment conditions. So with this kind of performance, we are confident that perhaps the pledge can be reversed in the future.

Operator

The next question is from the line of Ritesh Shah from Investec.

Ritesh Shah

Sir, my first question is, how should one look at the debt maturity at BRL level? And on the basis of that, you did indicate probably the intercompany loans don't exceed $956 million. But can you help us provide more comfort on the debt maturity and cash toward level, which does help us better understand that won't increase going forward? That's the first question, sir.

Sunil Duggal

Yes. Broadly without going into too many details of VRLs, it's a VEDL call, broadly, you will notice from all our public disclosures that things have sorted out till the end of this year at VRL. And in future, the financing for the next 12 months after that, it would be a combination of refinancing and repayment because we do have enough operational cash flows as well as a good amount of treasury balance, as you can see. And there is enough time to work out the specific course of action going forward.

Again, as I restated earlier, the intercompany loans have been capped that amount with a fixed repayment schedule. And if it's of any comfort, there is also difference in the way we approach the approvals going forward. All the subsidiaries, intercompany loan transactions will also come to the Vedanta Limited book. So it has additional oversight for your comfort.

Ritesh Shah

Right. Sir, correct me if I'm wrong. The debt repayment number for the next 21 months, which I pulled from the last bond document is $6.6 billion, including $2.2 billion at the company level. So this was a pretty steep number. And so what are the additional cash flows besides the upstreaming of dividends that we have from Vedanta to VRL? Are we alternate avenues, any other plans on asset divestment at the promoter level, which gives us confidence that this is something if you take out at $956 million?

Sunil Duggal

I think I would like to have some clarity on the numbers that were quoted. I think maybe we can handle it offline because the numbers are a little different from lower than what was quoted. So maybe we can help you with that off-line. But having said that, in a generic way, the 2 avenues or 3 avenues for us would be definitely our cash flows as you see, looking with almost $1 billion per quarter run rate. Second, refinancing, which I already mentioned, we continue to have excellent relationship with all the banks as well as a very good relationship with all the bondholders to go back for any capital market transaction despite the level at which the yields are for the parent bonds. And last but not the least, yes, the management will certainly look at all options, including asset disposals or any other strategic options if the need arises.

Ritesh Shah

Sir, secondly, post RBB will the management at Vedanta level be open to creating equation or potentially an open offer, given valuations are quite at this what it should be. So sir, what is the thought process over here?

Sunil Duggal

My sincere apologies, we will be unable to comment on market-related activities as it will be largely speculative in nature. If and when thought process emerges, then whatever are the processes of announcements we follow it at that point of time. So answering questions on this call on this bucket would not be possible because they are speculative as I said.

Ritesh Shah

Sure. And lastly, if I may, any clarity on PSC extension, there is point #4 in note to accounts, which is there, but I think there was another case on so if you could provide some final details on PSC as well as that will be quite useful?

Arun Kumar

So on PSC extension, as you know, that government has given the extension in 2018 itself for 10 years, but subject to the condition that the condition would condition that there were certain audit demands. So it actually means that when the PSC is to be given, there should not be any due. But by that time, they had raised some audit demand, which was a cost allocation and the pipeline cost, which we believe that is not tenable and not payable at this point of time. And as per the agreement, we want to go to the sole But with the mutual concern, we went to the arbiter and now as we stand the cases there will be arbitrated.

But in the meantime, the government has expressed the opinion that the amount -- they want to securitize the amount. But we are talking to the government. My comment is implying to actually file a consent to the core or the arbitrator where we can usually say that once the arbitration is settled, then they can recover the amount from us. But till then -- till such time, the amount is not established. They will not have the right to recover the amount from us. So I think that alignment is going on. But in the meantime, we have given the extension to us for the next 3 months' time. And we are in touch with them, and they have said that we will be very excited to resolve it within the next few days time, so that the ESC could be signed. And the government itself is very, very exciting. And they have given the assurance that since our projects are going on and we also have the plan to put up the ASP facility there to improving R&R and to improve the production from there. So we are in environment with each other. You will hear in the next few days that we'll be able to find the PSC.

Ritesh Shah

Can I squeeze in one more question, if it's possible, or if I can go back in queue.

Sunil Duggal

You can come back, I think.

Operator

The next question is from the line of Pinakin Parekh from JPMorgan.

Pinakin Parekh

Sir, my first question relates to the capital allocation. Till a few quarters back, we used to hear a lot about potential growth projects at Vedanta, which included oil expansion, which included the Lanjigarh alumina refinery expansion. But it seems that it's -- those projects have been put in cold storage. There is updates on that. So just trying to understand the reasons why these projects are not being aggressively pursued, is lack of capital or capital availability is constrained?

Sunil Duggal

No, it is not a constraint as such, I would say, as the commodity prices have changed, so we have evaluated all the projects. Different projects we have categorized in different categories like oil and gas, you are saying, some of the projects which are coming up and expected to deliver the volume this quarter itself. We continue to go with those projects. But some of the projects like ESP projects which you are saying, it was very capital-intensive. And the fruits of that was also supposed to come in the next 2 to 3 years' time. And breakeven crude prices up, that project is around $50 plus. But then we went back to the government and said that it is not tenable, and this project cannot be viable. And it is also very important to build the energy security for the country.

So government is looking at offer some incentives for enhanced recovery. So they have -- they are formulating a policy, which is an approval stake, and they are putting it up for the cabinet for the approval. And that is why we are holding on this way. Like other products you are saying, I mean, we are very excited. We want to go about it. But in the current context, we want to optimize the cost. We are negotiating with the different parties as to what could be the innovative ways of executing the projects. But we definitely will want to go ahead with the alumina project and some of the other products like in potline 6, some of the ports we already started. But we have devised the innovative way of funding in which the deferred payments we have devised.

So in the current context -- in the current environment, it's very important for us to be careful and to be able to evaluate the project so that it makes excellent sense for us.

Pinakin Parekh

Sure, sir. Sir, my second question is, when I go to Slide 17 of the presentation on the term debt maturities of Vedanta Limited between FY '22 and '23, there's nearly INR 24,000 crores of term debt maturities. Now, sir, given where, I mean, the situation is, how does the company look at this maturities? Would it be rolled over how is the interest cost -- should it trend higher? Or will it stay at these levels for these, when this debt is rolled over or repaid?

Arun Kumar

Yes. I think, Pinakin, I think -- thanks for the question. I think what we like to focus on is on the bottom bar that you see, where we can clearly see that in the last 3, 4 years, these are maturity profile at the time of that particular quarter. So it's a -- despite the passage of time, we have improved that profile. And that is exactly where we will continue to focus on. There, they need to -- a need to refinancing arrises.

Having said that aside, you heard the story from aluminum, and even oil and gas even at $40, $45 level. And hopefully, when the copper thing comes back perhaps end of the year or early next year, as Sunil briefed earlier, there is enough cash flows at the Vedanta limited that we may not need to refinance a large part of this debt, be it at the subsidiary level that they take care of themselves and at a stand-alone level. So I would say with this kind of cost profile and earnings generation, a part of this will come out for refinancing, and we don't believe that is an issue because if you look at our past history, we have been extremely strong in the way we are refinanced and done it proactively without improving the maturity profile and having done a lot of long-term financing even in the last 6 months where additively the COVID environment and the sort of the risk of environment and the financial and the banking sector was there to a certain extent. Mainly because of our deep relationship with all the banks and like I mentioned, the example of State Bank of India earlier. So I would say it is a combination of that, you would start relying more and more on the cash flows as you see the business come up.

Operator

The next question is from the line of Raashi Chopra from Citigroup.

Raashi Chopra

So I wanted two clarifications, please. One is on the dividend policy, is the policy that the dividend received from Hindustan Zinc has got to be upstream? Is it still in place, one? And if so, what is the time horizon within which it needs to be upstream? Second is, in case of upstream of any loans to Vedanta resources, is there a cutoff up to where you need or beyond which you need shareholder approval?

Arun Kumar

Yes. So the first question is on the dividend policy. As I mentioned early, the dividend policy, there is no change in the dividend policy. And we have not made any edits to its since it was posted and approved in 2015. The dividend policy talks about a minimum payout of 30% from Hindustan Zinc. And for Vedanta, a minimum payout of 30%, excluding the Hindustan Zinc profits, plus the pass-through of the Hindustan Zinc dividend with decision points on special large dividends, resting with the Board.

And in addition, the policy will also say it is as would be normal with any company, it will be the prerogative with the Board, given the fact that they have to take the environment into account, like if the company doesn't have any profits or with whether there are prolonged natural calamities, where COVID is like very, very clear example of that as well as it specifically on the prices of the commodities, et cetera, crash, which is also a very clear situation in the first half of the year, impacting the future profit substantially or where the liquidity needs to be protected. So there are various things laid out in the dividend policy. And the Board in its wisdom takes all of it into account while deciding to pass-through.

In the past, we have passed through those dividends largely within the same financial year, primarily to optimize on the BDT credit, as you would remember, in the old regime. And in the current regime, we are still tax efficient in the current situation, despite not having passed on for reasons as decided by the Board. I hope that addresses the first question.

And the second one, in terms of loans to VRL. Yes, there are very clear limits laid out from the companies that, and they all require Board and shareholder approval, largely. And as I mentioned earlier, these are from the overseas entity, which is not under the same book of the Indian Companies Act the NDR. And there is a certain level of flexibility and the degree of freedom to from there. But as I also mentioned, $956 million is a cap, and it will start coming down as the repayment schedule, as I would like to reiterate.

Raashi Chopra

Just one question. You had mentioned how much of this $956 million was in the second quarter? I missed that figure? And then how much was it post the quarter? Just if you could

Arun Kumar

As per the first quarter disclosure, the facility was $1,050 million -- $1.05 billion you would have noticed in our results declared -- late results declared albeit first week of October for first quarter. And that has now been reduced to $956 million. And of that, $207 million is repaid by June 2021 and thereafter $300 million every year.

Operator

The next question is from the line of Amit Murarka from Motilal Oswal.

Amit Murarka

So my question is, again, on the oil and gas business. On the production kind of level, so we've been seeing production stagnating marginally declining actually versus the guidance of a ramp-up. So what is the visibility on ramp-up being achieved, let's say, in the next 6 to 12 months, given that actually some of the growth projects are postponed?

Sunil Duggal

So it is not getting postponed as such. You see the -- there was a COVID impact and virtually some stoppage of the projects have taken place. So there were 7, 8 projects which were going on, starting from ESP projects and which my said that which has been put on hold now because of the But there are 6, 7 projects which are on track now getting commissioned in the current quarter, and this will get ramped up in the next quarter. And that is why we said that the current quarter exit rate could be around 180,000 barrels. And the FY '21 exit rate could be around 195,000 or so exit rate.

What are the current projects? So the 1 is the gas project. We are making around 25,000 barrels per day equivalent gas from the existing resource, but the wells are drilled and the wells have been fracked also. And the surface facility that the Petrofac plant is completed. The first gas has already happened. And the plant is getting commissioned. So maybe later in this month, we will start producing and then the ramp-up will start. This will double the gas volume in the next 2 to 3 months' time from existing, say, 20, 25 to 40, 45 in the next 2, 3 months' time.

Apart from that, we are also announcing the liquid handling facility by 30% because as the decline happens, we require some more polymer and water into the wells to suck more oil. And this facility is also getting commissioned. The 80% of the commissioning activity has already happened. And part of the facility also giving the result now. And the oil production from the MBA is looking up. Apart from that, there is another project polymer injection enhancement project, where the additional wells, injection wells, production wells are also drilled and the surface is getting commissioned. But that is being put up by the Halliburton. The liquor handling facility being done by LMT. Then Petrofac is doing the gas project.

But apart from that, the tight oil project is also getting commissioned. So the commissioning is going on as we are speaking. So -- and then the Rava project is almost completed. So all these projects will be able to deliver the volume, as I told you earlier. But apart from that, as I told you that some of the early monetizing facilities, we are trying to and cash in Cambay in Northeast Assam and in Rajasthan. So we have prioritized those facility where the success rate could be very high. And the volume addition could become very quickly. So the drilling is about to start in all our blocks in Rajasthan.

In the next month or so, the drilling may also start in Assam and then followed by Cambay. So all these 3 places, what we are trying to do is that we are trying to make a modular concept. We are drilling the exploration cum production well, not the exploration well, exploration cum production well. And as soon as the well is drilled, we start pumping the oil. And there is a self-funding process by which the success from that well proves that there is oil around and the multiplication of the wells will take place. So that gives us an opportunity that with these wells, although there are not many months left, we are still thinking that 5,000 to 6,000 barrels of the additional opportunities would come depending of course on the success rate, but the chances of success is very high. And this could add around 5,000 to 6,000 barrels. But this will open up a large opportunity to add the volume next year, maybe to the extent of 25,000 to 30,000 barrels.

But apart from that, ESP project, we are trying to redesign and make a modular concept where a big success facility. We will not put up at a very high cost. And we want to make it sustainable and the payable at the current oil prices. So a redesign is going on. But apart from that, there are some satellite fields, where some drilling has been done. Some issues we face there. But we are trying to redesign with our partners, Halliburgton. And this project will also reach that. But all in all, out of the, say, total project I 70% projects are on track, which will add on the volume from this quarter to the next quarter to the next year.

Amit Murarka

Okay. Also, on the PSC contention, are you disputing there's a $364 million that the demand is there or also the additional profit share, which the company is asking as per the renewal policy?

Sunil Duggal

So there are two aspects of that. One is that $356 million, which you are saying that government is demanding, which is a cost allocation, Mangala and Aishwariya from BA1 to Ba2. So there is a cost recovery issue from which resort we had to recover for the profit petroleum. This was actually approved by the government. It was done and dusted previously audited. And much later, there is some other auditors came make the audit objection and then government could not negate it, and they have to make a demand from us. We have disputed that demand because it is all approved from ONGC, all approved from DTH, Ministry, audit was done and it was closed.

So from our view plan, the demand is not tenable. Government also directly and indirectly agrees, but this has to pass-through a certain process. And that is why the government wants to securitize this amount as a condition of the PSC extension because the condition of the PSC extension is that there should not be any demand at the time of renewable of PSC. So we are trying to file a consent order in the court, wherein we will align with the government that this could be recovered if after arbitration, the demand is established. So this is what where we are. And I think we'll be able to resolve this in the next few days' time. The current extension they have given up to 31st January 2021. This is where we are. And second question, you said about -- what was your...

Amit Murarka

The additional profit petroleum of 10%...

Sunil Duggal

Yes. Yes. Yes. As per the new policy, the additional profit petroleum of 10%, that's been going up from 40% to 50%. So here, we have a dispute, and we have gone to the court and court has given us a stay. And court have also given the direction to the government that don't recover additional 10% till such time we conclude this case. So there is a stay, and they are also not recovering from us.

Our rationale behind this is that in the earlier contract, which was there for 25 years, it was -- it is written that if you produce the gas from the existing resource, you will be given the extension for another 10 years at the same terms and condition. And that is why we have been able to get the stay from the court.

Amit Murarka

Sure. No, but like if you have to go back to 2011, when you acquired the assets from Industry, I mean as per the PSC, you are not to pay any royalties still be paid by ONGC, but that was agreed upon that you will be paying it as part of the acquisition. So in this case, when the renewal is coming up, could the same thing not hold up like the additional tonnes of

Sunil Duggal

No, I don't think so because at that time, whatever they were to negotiate, they negotiated and that are closed. But they continued with the ESC for the year beyond our acquisition. And after that, the new condition cannot be applied for the contract which is already valid. That is our interpretation. And that is why we are saying that since it was written in the contract that if you will be able to produce the gas, the contract could be extended on the same terms and condition.

Operator

[Operator Instructions]. Ladies and gentlemen, we take the last two questions now. We take the question from the line of Vishal Chandak from Emkay Global.

Unidentified Analyst

Sir, if I look at your finance cost that you have mentioned on the presentation, it's at 7.8%. While as part of the cash management services, you have loan debt to be promoted at 7% unsecured, where we don't know what kind of cash flows will support. So how do you kind of reconcile these two?

Arun Kumar

Yes. I think one is a foreign currency level, right? And the 7.8%, you are talking about a blended cost of foreign currency and domestic loans. So it would be reasonable to assume that all foreign currency debt will be at a lower rate and the local currency will be a higher rate given the small proportion of the foreign debt that we have. And in any case, of 7% investment, the alternative for that entity is probably 1% or like?

Unidentified Analyst

Yes. So second, there is a small note on KCM loan as well. So if I look in the last quarter, this loan stood at about INR 437 crores, out of which INR 203 crores -- net of the provision of INR 203 crores, but this quarter, this has come down to INR 429 crores, while the provision has gone up. At the same time, we are maintaining that this amount is still recoverable. So are we increasing the provision on there on a quarterly basis? Or just wanted to understand some more color on this?

Arun Kumar

To the best of my knowledge, we haven't changed the provision. It is perhaps the exchange rate difference. We can have our team look back. The IR team can get back to you separately on that. The amount on the books we hold as a recoverable, and these will be evaluated from a quarter-to-quarter basis. So if we do take a decision based on the circumstances, based on the audit, based on the progress of the legal entity -- legal cases going on there, if the conclusion of the reasonable judgment is to either further take a provision or write it up, then we will be the first to do that. But right now, that threshold has not been reached both from an audit and an accounting and a reasonable judgment perspective.

Unidentified Analyst

Sure, sir. If I may squeeze in just the last question, sir. Even you mentioned that oil and gas impairment, at that point in time, the threshold for oil business, you have taken at $52?

Arun Kumar

I'm saying that I recollect that in our disclosure, it's probably around that amount and probably somewhere between $50 and $55 we have taken has been long-term oil average. I may not be able to exactly pick the dollar number between that in, but it should be fairly close.

Unidentified Analyst

But if we are still making money at even $42, then why is still writing off at $52 or maybe $55 million, what will be that number? What would be the rational now, again, you're still making money at $41, $43 also?

Arun Kumar

Okay. If I just spend a minute more on this, broadly, what we do on the price, we don't assume anything at all ourselves. We go by the consensus estimates. If I recollect, it's probably the metal bulletin consensus, oil consensus we've been following probably for the last 7, 8 years that I can recollect. And when I say long term average 52%, it would be year 1 would be probably $40, $45 range. Year 2 would be X, year 3 will be Y. And typically, when the price levels down to this kind of a level that in the last 6 months, whatever be the reason, pandemic or otherwise, then all the consensus estimates over the various time points, especially in the next 5 to 8 years start to get more conservative.

And since we don't, as a matter of policy, put our own thoughts because then we would have -- probably we would either get conservative or we would either get too optimistic. It's better to follow a set approach, what we call as an SOP that's agreed with the auditors. And which is why I earlier explained that perhaps a recovering global economy and some of the demand coming back, there could be more optimism into the future as people look at it. And then you have a series of data points and it starts going above the long-term average, as I mentioned, then perhaps there is a chance for writing back some of the impairment.

But again, one of the caveats I would always say is that in the accounting world, impairments happen faster, write-backs of impairments, typically a little bit more conservative because you need to be having a higher level of confidence around it. That's really the color of conservatism in accounting. And this company has been fairly conservative in its accounting policies and fairly compliant with high-quality auditors who audit our books. So I'll probably leave it there, and there are no absolutely lots of details on the annual report of FY '20 with detailed assumptions there. And it will be a pleasure to engage with you off-line to well deeper into the subject.

Operator

Ladies and gentlemen, we take the last question from the line of Rahul Jain from Systematics.

Unidentified Analyst

Sir, now the proposal has not passed through. Can we launch the proposal again at a suitable time? And if so, what is the time line? And also, the at the parent, we cannot really solve this problem through ICDs and this kind of some cash measures. So do we have any solid proposal or road map or how do we tackle the situation because we're only working against the interest of minority shareholders?

Arun Kumar

Thanks for your questions and observations. Firstly, on delisting, as I have clarified earlier, it will be speculative to comment on it. And the only other response, I'd like to add to that further is the is, in fact, the Vedanta Resources topic on top of the fact that this is made at a Vedanta Limited earnings call. So maybe to that extent, we are not even qualified to comment on it in any case.

On the second one on the debt of the parent, yes, there is a significant amount of debt as you observed. And we have laid out the generic road map, which could be a combination of abstaining from a handsome cash flow. We will have to depend on refinancing to a certain extent. And further, the management would be absolutely open to looking at asset sales and noncore disposals or any other strategic initiative.

At this point of time, even if one assumes that the VRL management is working on various options. It will announce if there is anything that is announceable on this. But having said that, we take your input and sentiment that one should deal with it and one should be -- one should try and come out with what is a specific action at around it.

Unidentified Analyst

Yes, sir one more thing on Balco, we see that EBITDA has come down despite a sharp increase in the aluminum price. So just wondering if there's something missing out there?

Arun Kumar

[Indiscernible].

Unidentified Analyst

In Balco, Q-o-Q EBITDA has come down from $4.3 billion to -- from $4.9 billion to $4.3 billion, so just wondering?

Arun Kumar

Okay. Maybe my small request would be to take it with the IR team. That's a level of detail that I may not be completely on to.

Operator

Ladies and gentlemen, that was the last question. I now hand the conference over to Mr. James Cartwright for closing comments.

James Cartwright

Thank you very much, operator. To conclude, thank you all again for taking the time to join this evening. So if shouldn't you have any further questions, please don't hesitate to contact myself or the rest of the IR team here. With that, I'd like to wish everybody a very good evening, and I'll pass back to the operator to take the call.

Sunil Duggal

Thank you, everyone.

Operator

Ladies and gentlemen, on behalf of Vedanta Limited, that concludes this conference. We thank you all for joining us, and you may now disconnect your lines.