Infra News - Published on Tue, 03 Nov 2020

VINCI Construction, through its UK subsidiary Taylor Woodrow, signed a contract with the North London Waste Authority to build recycling facilities, as part of the North London Heat and Power Project. The construction will begin in January 2021 after an Early Contractor Involvement phase during which preliminary works will be carried out and the design finalised. The project is scheduled for completion in October 2022 and worth a total EUR 87.4 million.

It includes
A Resource Recovery Facility with capacity to manage 135,000 tonnes of recyclable material every year
A Reuse and Recycling Centre for public and business use, enabling local residents to dispose of their waste directly
EcoPark House, a facility open to the public to raise awareness among the local community about the importance of the circular economy and reducing the carbon footprint of waste

The geotechnical engineering work will be conducted in synergy with Bachy Soletanche and Vibro Menard, both of which are VINCI Construction subsidiaries, which will complete the complex foundations to support the 74 m long processing hall.

Environmental considerations are at the heart of the project, which will include a rainwater collection system and a clean energy system powered by photovoltaic panels and geothermal energy. There is also an opportunity currently being investigated to harness the energy from the adjacent River Lee Navigation using hydro turbines. The facility will also be equipped with a cutting-edge ventilation system to neutralise any odours.

NLWA's drive is to achieve 50% household recycling rates and protect the environment by diverting up to 700,000 tonnes of non-recyclable waste from landfill. The Project's carbon savings are the equivalent of 215,000 tonnes of CO2 each year, in an area that is home to around 2 million people.

Tags: | | | | | | | | |

Posted By : Yogender Pancholi on Tue, 03 Nov 2020