Flash report on Mumbai power outage
Flash report on Mumbai power failureFlash report on Mumbai power failureSending a Central team: Union Power Minister
The power supply (in Mumbai) has been restored substantially, out of 2000 MW which went off, about 1900 MW has been restored, the remaining will be restored soon. The national grid is fine, the problem happened in some parts of the state grid.
We are sending a team from the Central Authority to Mumbai to sit down with the state transmission authority and find out where the problem was and how it started. There will be a discussion on the steps to be taken so it doesn't happen again.
CM Office Statement
CM Uddhav Balasaheb Thackeray discussed the power outage with Minister for Energy Nitin Raut and directed that immediate efforts be made to restore power supply in Mumbai and the Mumbai Metropolitan area. He has also instructed BMC Commissioner Iqbal Singh Chahal to maintain uninterrupted power supply to hospitals & directed the Chief Secretary that the control rooms & fire brigade should be vigilant & provide immediate assistance to prevent any accidents due to power cut. The Chief Minister has also directed the suburban railways to coordinate with the railway administration for immediate relief to the affected passengers.
Andheri East partly restored. Poonam Nagar, near L&T restored at 1.45PM
Supply to essential services restored: Energy Minister
Power supply to all essential services in Mumbai, Mumbai Suburbs, Kalyan, Thane, Palghar and New Mumbai have been restored. Non essential services will also be restored shortly: Energy Minister Nitin Raut
Adani Electricity Mumbai statement
“Due to transmission network failure outside of our system at around 10.05 this morning, power grid saw outages across utilities in Mumbai. However, Adani Electricity Mumbai (AEML), distribution system operated Islanding facility successfully and continued successfully power supply to vital installations with the help of Dahanu Thermal Power Station (DTPS). We wish we had more power for which we are dependent on grid input. The power supplies to remaining consumers of AEML are being restored in phased manner as input power is being restored by Grid operations of Maha," an AEML Spokesman said.
Navi Mumbai and part of Thane power supply restoration will take place in another one and half hours, says MahaTransco
Maharashtra Energy Minister Nitin Raut says power to hospitals being restored
Power supply to railways is restored. Power to other emergency services like hospitals are also being restored: Maharashtra Energy Minister Nitin Raut
Update from Adani Electricity
AEML System experienced grid disturbance due to fault outside of it. Islanding of Dahanu saved the essential supplies. Rest supplies are being restored as grid inputs get available from Maharashtra System. Please bear with us as we await Maharashtra grid restoration.
Statement by Adani Electricity, Mumbai
There is a major power grid failure due to which supply is affected in most areas of mumbai. As per grid safety protocols, Adani Power System has been able to sustain and islanded. AEML is currently supplying to critical services in Mumbai Around 385MW through AEML Dahanu generation. Our teams are working to restore the supply in the affected areas at the earliest. We regret the inconvenience caused
BMC Helpline numbers
The Brihanmumbai Municipal Corporation has released a set of emergency helpline numbers in case of emergencies. This can be utilised by residents of Mumbai.
Emergency Helpline Numbers:
022-22694727
022-22694725
022-22704403
Statement by Maharashtra Energy Minister Nitin Raut
Mumbai-Thane-Kalyan power failure is being attended to.
Kalwa- padgha transmissions line got tripped, hence Thane- Palghar, New Mumbai power is off.
Consequently, cascading the power failure to Mumbai-Thane & Mumbai suburban city.
It will be restored in approximately an hour.
Power restored in Vile Parle
Power restored in some areas
Power restored at Bhandup, Vikhroli, Mulund, Mazgaon, Charni Road, Kala Ghoda.
Tata Power company statement
At 10.10 am there were simultaneous substation tripping in MSETCL's Kalwa, Kharghar causing a huge dip in frequency in the Mumbai transmission system which led to tripping of Mumbai power supply. Restoration work in is in progress to bring supply from the 3 Hydro units and Trombay units once the MSETCL transmission lines are connected. Inconvenience is regretted
Power restored in Thane and adjoining areas
480 MW of total 2600 MW power restored
Latest updates:
400kV Pune-Kalwa line was under forced shutdown since 13:47 hrs due to R-Y phase fault. Pune end fault current-11.13 Kamp Dist-30.4 KM
E/S on 400kV Kalwa-Padghe line-1 availed by Maharashtra at 06:54hrs. Expected to be revived by 09:30hr but could not be revived by Maharshtra.
At 09:58hrs 400kv Kalwa-padghe-2 carrying 633MW tripped . The flow on Pune-Khargar rose upto 900MW and tripped at 10:00hrs.
Khargar ICT-1 & 2 also tripped at 10:05hrs resulting in load drop of 360MW in Mumbai system.
SLDC Kalwa is requested to normalize 400kV Kalwa-padghe-1 immediately and take Pune –Khargar via TBC into service.
Mumbai island system was seperated but could not be on holt
About 900MW load dropped at 10:05hrs.
Total load drop about 1300MW
As informed by Maharastra, Pune-Khargar line hand tripped due to heavy sparking
Total mumbai load loss is 2600MW
Pune-Khargar line closed at 10:27hrs
Nearly 20 lakh of the total 2.50 crore consumers of MahaVitaran are affected due to grid failure
400KV Kalwa - Padgha Circuit 1 was under outage.
400kv Kalwa - Padgha Circuit 2 suddenly tripped
400KV Kalwa - Talegaon was under shutdown
400KV Kalwa - Kharghar got tripped on Over load.
All 400KV incomers to Kalwa tripped, causing tripping of 02 Nos. Of ICTs at Tata Power - Salset Substation due to which Tata Power & Adani Power Supply affected.
400kv Kalwa - Padgha Circuit 1 already taken in service. Restoration of Other Circuits is in process & shall be restored shortly
Preliminary Information from BMC Disaster Management Dept
Date of incident: 12.10.2020
➡ Time of incident reported :@1015hrs
➡ Incident reported by: BEST Supply Control
➡ Incident : Power Failure Level- L0
➡ Details: Electric power failure due to Central grid failure of TATA Power at Kalwa. It will take 45 min to 1 hr to restore the supply.
➡ Impact:1) Failure of Electric Supply all over Mumbai City & Suburb 2) Train traffic of all lines Central, Eastern & Western disrupted.Tata Power system developed fault...Now power supply getting restored stepwise..hospitals first220 KV Uran GTPS restored just now
Dahanu has islanded with 380 MW. All COVID hospitals and essential establishments being catered too
Islanding worked at AEML despite massive load throw off due to grid disturbance. More load of essential services being added as Dahanu has capacity of another 100 MW.
Electric supply of entire western region is tripped...will take at least 2 hrs to restore....all Hospitals to ensure backup supply for 4 hrs for patients safety
All trains on Western Railway and Central Railway services suspended in Mumbai following citywide power grid failure.
Some Tata customers are not affected because of separate islanding.
Residents across Mumbai, Navi Mumbai and Thane on Monday reported power cuts on Monday.
Sources from BEST power supply said there is currently off supply in entire MMR region due to grid failure.
"The electric supply is inttruptted due to TATAs incoming electric supply faiure. Inconveniences is regretted," BEST Electric Supply said on Twitter.
"There is multiple tripping of lines and transformer (Kalwa-padghe and Khargar ICTs) supplying power to Mumbai system . 360 MW supply in Mumbai and suberbs affected. Restoration under process," it said.
Residents of Kurla, Ghatkopar, Chembur, Andheri, Juhu, Chandivali, Vashi Malad confirmed that there is currently no power supply at their homes.
More details awaited.