Feasibility study of Chennai-Bangaluru-Mysore high speed rail corridor conducted: Rlys

Press Trust of India  |  New Delhi 

Railways has conducted a feasibility study for Chennai-Bangaluru-Mysore route of high speed rail corridor, the Parliament was informed Friday.

In a written reply in Rajya Sabha, of Railways Piyush Goyal said the study was conducted with the cooperation of the

However, he said that no Cabinet note has yet been prepared for it.

He also said that the railways has no plans to prepare a detailed project report on the corridor presently.

The railways is in the process of implementing the high speed rail corridor between and in collaboration with

(This story has not been edited by Business Standard staff and is auto-generated from a syndicated feed.)

First Published: Fri, June 21 2019. 16:25 IST