WR to build 64 FOBs on suburban network\, including 30 in 2019

WR to build 64 FOBs on suburban network, including 30 in 2019

Press Trust of India  |  Mumbai 

Western Railway will build 64 foot overbridges over the next two years, 30 of which will be ready for use in 2019, a said Friday.

He informed that WR had commissioned 19 FOBs in 2018 and four new ones would come up before the end of the current fiscal in March this year.

He said a greater number of FOBs on the suburban network would provide relief to commuters and also bring down instances of people trying to cross tracks to change platforms.

Plans to build FOBs in the metropolis gained momentum after a stampede on a narrow bridge connecting Parel and Elphinstone (now Prabhadevi) stations in September, 2017 killed 23 people.

A cave-in of a portion of a bridge at the southern end of in July last year had killed five people, prompting to order an audit of all such structures on the of WR and Central Railway.

Ravinder Bhakar, of Western Railway, said meticulous planning and time bound execution was ensuring that FObs were being built at a fast rate across its network.

He informed that the Carriage Repair Workshop at Lower Parel had built a modified for speedy checking of these structures.

An order for an 8-wheel had also been placed with the Dahod Workshop, he informed.

(This story has not been edited by Business Standard staff and is auto-generated from a syndicated feed.)

First Published: Fri, January 04 2019. 15:15 IST