Need automatic \'Right of Way\' approval for 5G preparedness: COAI

Need automatic 'Right of Way' approval for 5G preparedness: COAI

IANS  |  New Delhi 

The (COAI) on Monday said the industry needed a for (ROW) for the country to be prepared for connectivity.

refers to the legal right, established by usage or grant, to pass along a specific route through grounds or property belonging to another. In terms of telecom industry it refers to the right to establish infrastructure such as towers and fibre cables.

Speaking to the reporters here, Rajan Mathews, of the industry body said that there should be no restriction on tower installations as it affects coverage and quality of services of

"Need for ROW for preparedness wherein approximately 1,000 BTS (Base Transceiver Station) are required per square kilometre," according to a presentation.

sought a single window clearance for setting up infrastructure in a time bound manner and a one time "nominal" administration fee. It further asked for the alignment of all state telecom infrastructure policies with the Department of Telecommunications' RoW Rules, 2016.

Lack of telecom towers and optical fibre, according to Mathews is a major reason of call drops in the country.

Other reasons for call drop include "congestion (overloaded cell sites)", weather condition which affects links, faulty handsets, shutting down of mobile towers and sealing by local authorities, the presentation showed.

--IANS

rrb/ahm/bg

(This story has not been edited by Business Standard staff and is auto-generated from a syndicated feed.)

First Published: Mon, November 19 2018. 21:58 IST