Modi inaugurates India\'s first multi-modal inland waterways hub in Varanasi

Modi inaugurates India's first multi-modal inland waterways hub in Varanasi

This is the first of the four multi-modal terminals being constructed on the National Waterway-1

Press Trust of India  |  Varanasi (UP) 

inland waterways
Varanasi: Prime Minister Narendra Modi inaugurates the first multi modal terminal constructed on River Ganga. Photo: @ANI

Prime Minister on Monday inaugurated India's first multi-modal terminal on the Ganga river in his parliamentary constituency here and received the country's first container cargo transported on from Kolkata.  

The first consignment containing food and beverage had set sail from Kolkata in the last week of October.

The prime minister was accompanied by Uttar Pradesh Chief Minister Yogi Adityanath, Union Transport, Highways and Shipping Minister Nitin Gadkari and BJP state president Mahendra Nath Pandey, who is also the MP of the neighbouring Chandauli Lok Sabha constituency.
 

This is the first of the four multi-modal terminals being constructed on the (river Ganga) as part of the World Bank-aided project of the Authority of India.   

The total estimated cost of the project is Rs 53.6918 billion, which will be equally shared between the Government of India and the World Bank.

Earlier, upon his arrival here, the prime minister was given a detailed presentation of the waterways and watched a short film on the viability of the waterways between Varanasi in Uttar Pradesh and Haldia in West Bengal.
 

ALSO READ: Road monetisation model to be adopted for inland waterways project 

According to an official statement, the Centre's Project aims at developing the stretch of the river between Varanasi and Haldia for navigation of large vessels weighing up to 1,500 tonnes to 2,000 tonnes.

Its objective is to promote as a cheap and environment-friendly means of transportation, especially for cargo movement. The Inland Waterways Authority of India (IWAI) is the project implementing agency.

The project entails construction of three multi-modal terminals (Varanasi, Sahibganj and Haldia), two inter-modal terminals, five roll-on-roll-off (Ro-Ro) terminal pairs, new navigation lock at Farakka in West Bengal, assured depth dredging, integrated vessel repair and maintenance facility, differential global positioning system (DGPS), river information system (RIS), river training. 

First Published: Mon, November 12 2018. 16:40 IST