Durga Puja rush: Kolkata Metro records highest ever footfall with over 9 L passengers on Shashti

Press Trust of India  |  New Delhi 

The Metro has recorded its highest-ever footfall of more than nine lakh passengers on Shashti, the second day of Puja festival, railways said Tuesday.

"This is the highest footfall recorded by the Metro since its inception. The previous highest passenger count was 8.78 lakh on September 25 this year," a railway said.

The Kolkata Metro has run 300 services on Monday to cater the puja rush. It has scheduled 224 services on Saptmi, Ashtmi and Navmi during the puja.

The will be available to passengers from 1.40 PM to 4.00 AM.

On Dasami, 118 services will be run from 1.40 PM to 10.00 PM.

The Kolkata Metro has taken all possible measures anticipating huge puja rush. Elaborate security arrangements have been made and medical personnel have been deployed at the stations, the said.

(This story has not been edited by Business Standard staff and is auto-generated from a syndicated feed.)

First Published: Tue, October 16 2018. 14:01 IST