Empty prisons, grounded warplanes: U.S. budget dysfunction hits home

Reuters  |  WASHINGTON 

By Andy Sullivan

(Reuters) - Three hours west of Chicago, a federal prison stands ready to take in thousands of inmates and hire hundreds of guards, but its expansion is on hold, awaiting approval from a U. S. that is again paralysed by budget disputes.

In Florida, the patrols the waters off Donald Trump's Mar-a-Lago resort, working off an outdated budget that has not increased to account for this new mission.

Across the country, with the 2018 fiscal year well under way, the is carrying out duties ranging from nuclear weapons development to homeless assistance, but its spending levels and priorities are four months out of date.

That is because Congress, once again, failed last year to approve a new budget on time by Oct. 1. Instead, lawmakers since then have approved three temporary spending measures that have kept the fiscal 2017 budget in place.

On Thursday, congressional Republicans and Democrats were fighting furiously over the terms of a fourth temporary measure, known as a continuing resolution, that would extend funding past its Friday midnight expiration.

Congressional leaders see another temporary extension as a better option than the alternative: a partial shutdown that would furlough hundreds of thousands of federal workers and shutter landmarks such as the

Their plan would include a few exceptions. The could go ahead with a missile defence program, for example. But otherwise it would keep government spending effectively on autopilot.

has managed to pass its spending bills on time in only four of the past 40 years, according to the (GAO), a congressional in-house watchdog. (Graphic on missing deadlines to pass spending bills: http://tmsnrt.rs/2Dj1hdQ)

Last year, after three continuing resolutions, Trump enacted the fiscal 2017 spending bill on May 5 - 216 days late.

INAUGURATION BILLS

Dysfunction on this level often prevents the government from launching new projects and closing out those that have run their course. It also fails to account for inflation, salary increases and other rising costs.

"You're stuck with old decisions, whether or not those are the right decisions for 2018," Marc Goldwein, at the Committee for a Responsible Budget, said in an interview on Thursday.

For example, last year's spending bill set aside $20 million to reimburse Washington-area local governments for the cost of providing security during Trump's January inauguration. Those instructions remain in the current spending bill even though the inauguration has long since passed.

Meanwhile, with the fiscal 2018 budget still incomplete, the says it is waiting to launch what it says is a much-needed rebuilding effort after 16 years of continuous war.

The National Institutes of Health has already scaled back medical research, due to uncertainty over how much it will ultimately get from

The is continuing pre-construction work on a prison in that it says it does not need, even as the facility stands idle.

In Idaho, state health official has abandoned the idea of strengthening a computer system for tracking outbreaks of influenza, and other

With funding uncertain for the U.

S. Centers for Disease Control and Prevention, Turner said, she does not know whether she can budget more hours for outside data analysts to build out the system. Though her application is not due until May, Turner said, it is already too late to line up a

"It can be disheartening," she said. "The frustration of having this nebulous unknown sitting in front of us makes it much more difficult to plan for the future."

Past budget delays have curtailed and drug inspections and slowed veterans' benefits claims, according to a 2009 GAO report, and forced the to postpone upgrades to a computer system used in counterintelligence work.

WARPLANES AND MARINES

This year, spending delays have forced the to scale back training exercises, leaving planes on the ground and Marines in the barracks. Military officials also say they have postponed purchases of bombs and missiles.

Budget delays prevent buying in bulk, as well, forcing the government to spend more on repeated, smaller contracts on everything from to bullets.

The uncertainty has cost the U. S. Navy $4 billion in recent years, according to "Since 2011, we have put $4 billion in the trash can, put lighter fluid on top of it, and burned it," Spencer said at a forum on Dec. 4.

For a rural stretch of Illinois, the problem is not that dollars are burned - it is that they are frozen.

"Just like every other government agency, we're kind of waiting for the 2018 budget to be signed," said Lynelle Asberry, an to the in Thomson,

The has spent years upgrading fencing, computers and other facilities at a prison it bought from the state of Illinois, readying it for 2,900 maximum-security prisoners. The next step is to hire 300 or so prison guards, medical staff and other personnel.

All that is needed now is for to approve the $80 million required to finish the job.

"We'll believe it when we see it," said Everett Pannier, of the nearby town of Morrison, which is looking forward to an economic boost from the project. "It's a beautiful facility, if a prison can be beautiful."

(Reporting by Andy Sullivan; Editing by and Matthew Lewis)

(This story has not been edited by Business Standard staff and is auto-generated from a syndicated feed.)

First Published: Fri, January 19 2018. 02:09 IST