Train driver could not have prevented collision: Khaw

Mr Khaw pointed out that having the Tuas West Extension running on a new signalling system while the rest of the East-West Line was operating on the old system contributed to the problem.
Mr Khaw pointed out that having the Tuas West Extension running on a new signalling system while the rest of the East-West Line was operating on the old system contributed to the problem.

No time to react as emergency braking situation not expected