Saturday, January, 06, 2018
  • Nation
  • World
  • States
  • Cities
  • Business
  • Sport
  • Entertainment
  • Galleries
  • Videos
  • Life Style
  • Specials
  • Opinions
  • All Sections  
    States Tamil Nadu Kerala Karnataka Andhra Pradesh Telangana Odisha
    Cities Chennai DelhiBengaluru Hyderabad Kochi Thiruvananthapuram
    Nation World Business Sport Cricket Football Tennis Other Education Social News
    Entertainment English Hindi Kannada Malayalam Tamil Telugu Review Galleries Videos
    Auto Life style Tech Health Travel Food Books Spirituality
    Opinions Editorials Ask Prabhu Columns Prabhu Chawla T J S George S Gurumurthy Ravi Shankar Shankkar Aiyar Shampa Dhar-Kamath Karamatullah K Ghori
    Edex Indulge Event Xpress Magazine The Sunday Standard E-paper
Home States Andhra Pradesh

Andhra Pradesh: Polavaram upper cofferdam gets design team’s nod

By Express News Service  |   Published: 06th January 2018 02:06 AM  |  

Last Updated: 06th January 2018 09:06 AM  |   A+A A-   |  

0

Share Via Email

VIJAYAWADA:  The Polavaram Dam Design Committee on Friday gave permission for the construction of an upper cofferdam, setting aside the recommendation of the National Hydro Power Corporation (NHPC). The decision was taken after a meeting in Delhi chaired by Dam Design Committee chairman AB Pandya. The committee’s decision clears the way for the construction of the upper cofferdam along a length of 2,800 meters. However, the height of the cofferdam was not disclosed. 

According to Water Resources Department officials, the NHPC recommended the construction of part upper cofferdam and part earth-cum-rock-filled dam simultaneously. However, rejecting the recommendation, the chairman opined that it was not advisable to experiment with a large river like the Godavari, which has a huge discharge rate, the officials said.According to them, Pandya said the cofferdam and the main dam should be constructed separately and was of the opinion that once the cofferdam is constructed, the main dam works could  be taken up any time without interruption. 

Water Department officials said with permission accorded to the upper cofferdam, Polavaram project works would gain momentum. “Even during floods, we can continue to construct the dam,” an official of the department said. The officials are now waiting for the Centre’s permission for spillway tender process.

Transstroy vehicles seized
Dena Bank seized machinery belonging to Transstroy, the main Polavaram contractor, for defaulting on loans of over `120 crore. The company took a loan of `84 crore from the bank to buy 64 machines. The sum rose after it failed to pay instalments for a long time.

Stay up to date on all the latest Andhra Pradesh news with The New Indian Express App. Download now
TAGS
Polavaram Dam Design Committee National Hydro Power Corporation Polavaram

O
P
E
N

More from this section

Andhra Pradesh CM Chandrababu Naidu’s SEZ promise in Visakhapatnam circle set to spur job market

Visakhapatnam: Route clearance vehicle up in flames in Agency

Andhra Pradesh: Bank seizes machinery of Polavaram contractor over Rs 120 crore loan default

Latest

Tamil Nadu bus strike: Stir continues for third day despite HC warning

PMLA case: 2nd charge sheet filed against Misa Bharti, husband

Has PTI chief Imran Khan secretly married again?

Intense cold kills over 70 in Uttar Pradesh

Sushma Swaraj meets ASEAN General Secretary in Indonesia

J-K: Engineer killed, 8 missing as avalanche hits a cab

N Korea 'likely' to join Winter Games': IOC official

Videos
RBI unveils new Rs 10 banknotes 
For India, relations with ASEAN region is a key priority: Sushma Swaraj 
arrow
Gallery
Bajirao Mastani, a 2015 movie, directed by Sanjay Leela Bhansali, is a historical romance. In Bajirao Mastani, Deepika plays the role of a warrior princess who falls in love with  Peshwa Bajirao, who is already married to  Kashibai. (Photo | Youtube screengrab)
From Bajirao Mastani to Cocktail: Here are the top seven movies of Deepika Padukone
Trump is storming into the new year in exceptionally aggressive fashion, picking fresh fights on Twitter with such speed that his aides, international partners and the public are struggling to catch up. If he was brash on the global stage in Year 1, the first days of Year 2 suggest he was just warming up. (Photo | AP)
Donald Trump steps into 2018 with fresh foreign fights on Twitter 
arrow

FOLLOW US

Copyright - newindianexpress.com 2018

Dinamani | Kannada Prabha | Samakalika Malayalam | Malayalam Vaarika | Indulgexpress | Edex Live | Cinema Express | Event Xpress

Contact Us | About Us | Careers | Privacy Policy | Search | Terms of Use | Advertise With Us

Home | Nation | World | Cities | Business | Columns | Entertainment | Sport | Magazine | The Sunday Standard