JV to use reverse circulation drill method and special steel from Japan for construction
TATA Projects Limited in a Joint Venture with Daewoo E&C of South Korea has announced that they have secured an $850 million contract (Rs. 5,612 Crores) to design & build a part of India’s longest sea-bridge – Mumbai Trans Harbour Link.
While the TATA JV emerged as the lowest bidder for both the Sea Packages 1 & 2, it was awarded only one of the packages (package 2) as provided in the tender conditions. The package awarded to Daewoo – TATA Projects JV involves construction of a 7.8 km long bridge section across the Mumbai Bay including Shivaji Nagar Interchange at Navi Mumbai at contract value of Rs. 5,612 Crores ($850 million), which is a complex stretch.