Wednesday, December, 13, 2017
  • Nation
  • World
  • States
  • Cities
  • Business
  • Sport
  • Entertainment
  • Galleries
  • Videos
  • Life Style
  • Specials
  • Opinions
  • All Sections  
    States Tamil Nadu Kerala Karnataka Andhra Pradesh Telangana Odisha
    Cities Chennai DelhiBengaluru Hyderabad Kochi Thiruvananthapuram
    Nation World Business Sport Cricket Football Tennis Other Education Social News
    Entertainment English Hindi Kannada Malayalam Tamil Telugu Review Galleries Videos
    Auto Life style Tech Health Travel Food Books Spirituality
    Opinions Editorials Ask Prabhu Columns Prabhu Chawla T J S George S Gurumurthy Ravi Shankar Shankkar Aiyar Shampa Dhar-Kamath Karamatullah K Ghori
    Edex Indulge Event Xpress Magazine The Sunday Standard E-paper
Home Cities Bengaluru

Non-stop Metro trains to City airport in 2021: BMRCL chief

By S Lalitha  |  Express News Service  |   Published: 13th December 2017 01:56 AM  |  

Last Updated: 13th December 2017 07:45 AM  |   A+A A-   |  

0

Share Via Email

BMRCL’s new Managing Director Mahendra Jain | Express

BENGALURU: Air travellers are likely to shell out at least Rs 60 extra on the User Development Fee (UDF) paid presently at the Kempe Gowda International Airport.
The Bangalore Metro Rail Corporation Limited (BMRCL) will shortly send a proposal to the Centre seeking its nod for the move. The Corporation is also open to the idea of running non-stop trains from the City to the airport.

Additional Chief Secretary of Urban Development department, Mahendra Jain, who took charge as BMRCL’s new Managing Director on Sunday told The New Indian Express, “To mobilise the contribution of Rs 1,000 crore to be made by BIAL for the Airport Line (Metro Phase-2B), the UDF will be increased anywhere between Rs 60 and Rs 80. This will be a temporary move until the required amount is met. Now that the Cabinet has approved the Detailed Project Report of the Metro link to airport, a proposal to effect the increase in user fee will be sent as soon as possible to the Civil Aviation Ministry and the Airport Economic Regulatory Authority in this connection.”

At present, domestic users of the airport pay Rs302 as UDF while international passengers pay Rs 1,200. Asked about the chances of receiving a green signal for the move, Jain said, “We are expecting it to be cleared. This is a very reasonable proposal as it is a slight increase over what passengers are already paying.”The move will be a temporary one and the increase would be withdrawn after the required funds are mobilised, the MD said.

Due to the new Metro Policy which mandates 10 percent contribution from the Centre, the Centre will be funding Rs 500 crore, he added. “With funds mobilised, this line is now set to be completed by 2021. It was initially supposed to be ready only in 2025 or 2026 as part of Metro Phase-III,” the MD said.  
Elaborating on other specifics relating to this route, Jain said, “We are looking at having specially designed trains which will have racks to hold luggage of passengers. Right from the first train, there will be six coaches in every train.”

Tenders for the Metro Airport Link line will be floated soon and work will start within six months, the MD said. “The airport line is an extension of the Nagavara-Gottigere Line for which tenders have been floated. Both the lines are set to be ready by 2021.”

Non-stop trains

Another major move planned is the introduction of many non-stop trains from Nagavara to the airport during peak travel time to the airport (5 am to 8 am).With the second terminal being planned for KIA, the 20 million passengers to KIAL will double to 40 million when it is ready. “The nearly 1 lakh employees in both the terminals will have easy access to their work places. With M G Road proposed as an Interchange station, public from all corners of the City can change over here,” the ACS said.Jain ruled out two incoming and outgoing tracks as suggested by experts. “There will only be a 5-metre strip of land that we get near Yelahanka. We can only accommodate two tracks and not four on it,” he pointed out.

Airport line  likely to cost s5,950crore
The DPR of the 29.62- km Airport line from Nagavara to KIA was approved by the State Cabinet on Monday. It is estimated to cost Rs 5,950 crore and has a completion deadline of 2021. BIAL will fund Rs 1,000 crore, the State Rs 1,250 crore and the Centre Rs 500 crore. The remaining Rs 3,200 crore will be raised through loans.

Stay up to date on all the latest Bengaluru news with The New Indian Express App. Download now

O
P
E
N

More from this section

Tanker owner booked for diesel theft

Visit hostels, you will be shocked, Chief Secy told

Two jail inmates to walk out with PG degrees

Latest

Cyclone Ockhi UPDATES | Death toll climbs to 52, search for missing fishermen continues

Boeing to make aircraft components near Bengaluru

Journalist, author Rabisankar Bal dead

Diego Maradona loses cool after car mobbed in Kolkata

Upgraded Hubballi airport opened in Karnataka

PM Narendra Modi to visit Gujarat again to vote

Bangladesh police detains New York bomber's wife, in-laws

Senior Congress leader Chaudhary Prem Singh passes away

Lucknow's first woman mayor, 110 corporators sworn in

Videos
In a first, 20 women officers from Afghanistan trained in Chennai
Condom ads continue to spark controversy 
arrow
Gallery
A massive fire broke out at a biscuit factory near Bairamalguda in the LB Nagar limits, Hyderabad in the early hours of Tuesday.The fire department was alerted immediately by the locals who noticed the flames and the fire tenders rushed to the spot to douse the flames.With the fire so massive, two more fire tenders were called in to bring the situation under control. Locals panicked on witnessing the smoke engulfing the nearby localities with the factory located in residential area. (EPS | Swamiye Saranam Ayyappa)
IN PICTURES | Massive fire breaks at biscuit factory near Bairamalguda in Hyderabad
The Ministry of Information and Broadcasting has pulled the curtains on TV commercials publicising condoms. Here's how people reacted to the move by the governments. (Image Courtesy Twitter@Joydas)
Here's how Twitterati slammed the ban on condom advertisements from 6 am to 10 pm
arrow

FOLLOW US

Copyright - newindianexpress.com 2017

Dinamani | Kannada Prabha | Samakalika Malayalam | Malayalam Vaarika | Indulgexpress | Edex Live | Cinema Express | Event Xpress

Contact Us | About Us | Careers | Privacy Policy | Search | Terms of Use | Advertise With Us

Home | Nation | World | Cities | Business | Columns | Entertainment | Sport | Magazine | The Sunday Standard