Friday, December, 08, 2017
  • Nation
  • World
  • States
  • Cities
  • Business
  • Sport
  • Entertainment
  • Galleries
  • Videos
  • Life Style
  • Specials
  • Opinions
  • All Sections  
    States Tamil Nadu Kerala Karnataka Andhra Pradesh Telangana Odisha
    Cities Chennai DelhiBengaluru Hyderabad Kochi Thiruvananthapuram
    Nation World Business Sport Cricket Football Tennis Other Education Social News
    Entertainment English Hindi Kannada Malayalam Tamil Telugu Review Galleries Videos
    Auto Life style Tech Health Travel Food Books Spirituality
    Opinions Editorials Ask Prabhu Columns Prabhu Chawla T J S George S Gurumurthy Ravi Shankar Shankkar Aiyar Shampa Dhar-Kamath Karamatullah K Ghori
    Edex Indulge Event Xpress Magazine The Sunday Standard E-paper
Home States Tamil Nadu

Tamil Nadu unable to realise full power from Kudankulam, says Electricity Minister P Thangamani

By Express News Service  |   Published: 08th December 2017 02:32 AM  |  

Last Updated: 08th December 2017 08:14 AM  |   A+A A-   |  

0

Share Via Email

Kudankulam nuclear power plant. (Express File Photo)

CHENNAI: Tamil Nadu could not realise the full quantum of allocated power from Kudankulam Nuclear Power plant in Tirunelveli district as the first two units are facing technical glitches, according to Electricity Minister P Thangamani.

Addressing the conference of Ministers for Power and New & Renewable Energy of States & Union Territories in New Delhi, he said the State has been allocated 1,125 MW from Kudankulam Units 1 and 2 having a total installed capacity of 2,000 MW.

However, Kudankulam Nuclear Power Plant Unit 1 was generating only around 800 MW due to sea water intrusion into the system and Unit 2 is under forced shutdown since August 4, 2017 due to Stator Cooling Water Motor Trip.

When New Indian Express contacted Hari Narayan Sahu, Site Director of Koodankulam Nuclear Power Project, he said initial glitches were there but they have been rectified. He said sea water intrusion was there in the secondary water system, affecting its chemistry. “As a result, we cut down on power generation and it was generating only 800 MW to remove additional sodium and chloride content present in sea water. Two days ago, the Unit I was generating 1,000 MW and similarly Unit II is also generating 1,000 MW as the technical glitches have been rectified,” he said.  

Meanwhile, Thangamani also urged the Union Power Minister to allocate the entire power generation of 2000 MW to Tamil Nadu from Kudankulam plant units 3 & 4.

The minister also highlighted the coal crisis being faced by thermal power plants in the State. “Less realisation of domestic coal under regular Fuel Supply Agreements (FSA) and poor realisation under additional agreements signed for import substitution have led to critical coal stock levels at all Thermal Power Stations of Tangedco. Due to this, some of the units are under shutdown,” he said.

“Several representations have been made to Government of India and Coal India Limited (CIL) to improve the supply of domestic coal. Although domestic coal realisation has increased from 65 per cent during September 2017 to 68 per cent in October 2017. But this is far less than the requirement as a result Tangedco is being forced to import coal,” the minister added.

He urged the Union Power Ministry to recommend to Ministry of Coal to direct Coal India Limited to supply 72,000 tonnes of coal on a daily basis and railway authorities to allot 20 rakes daily.  The minister also sought a long term coal linkage to the tune of 18.28 tonnes per annum to meet the coal requirements of the upcoming projects.

Stay up to date on all the latest Tamil Nadu news with The New Indian Express App. Download now
TAGS
P Thangamani electricity Kudankulam nuclear power plant Tamil Nadu electricity

O
P
E
N

More from this section

RK Nagar bypoll: TTV Dhinakaran allotted 'pressure cooker' symbol

RK Nagar bypoll: CM Palaniswami, O Panneerselvam hit campaign trail, reach out to poor with promise of houses

RK Nagar bypoll: Dhinakaran splurge to induce voters in April gives him good recall value

Latest

Cyclone Ockhi UPDATES | Death toll rises to 36

RK Nagar bypoll: TTV Dhinakaran allotted 'pressure cooker' symbol

Cristiano Ronaldo wins fifth Ballon d'Or award

Mass murder: Ex-Assam Congress minister faces heat

China was informed about drone that crashed, says India

Bengal BJP wants 'fake cases' against Gurung withdrawn

Illegal immigration: Centre plans integrated border protection grid

Luxury car case: Court issues non-bailable warrant against Sasikala's husband

Videos
Watch: Man burnt to death in Rajasthan in the name of 'Love Jihad'
Pakistan pays tribute to Shashi Kapoor
arrow
Gallery
An inferno engulfed the Los Angeles region on Wednesday, forcing more than 200,000 people to flee and threatening thousands of homes, including mansions in the luxurious Bel-Air neighbourhood. IN PIC: Motorists on Highway 101 watch flames from the Thomas
IN PICTURES | California wildfires rage forced more than 200,000 people to flee, luxury mansions threatened
President Franklin D Roosevelt declared on 7th December 1941 'a date which will live in infamy'. The deadly surprise attack by Japanese on the US Pacific Fleet at Pearl Harbour damaged 21 warships and destroyed more than 150 planes; 2,400 were killed. And
Pearl Harbour Remembrance Day: 10 facts about the deadly attack which claimed more than 2,000 lives
arrow

FOLLOW US

Copyright - newindianexpress.com 2017

Dinamani | Kannada Prabha | Samakalika Malayalam | Malayalam Vaarika | Indulgexpress | Edex Live | Cinema Express | Event Xpress

Contact Us | About Us | Careers | Privacy Policy | Search | Terms of Use | Advertise With Us

Home | Nation | World | Cities | Business | Columns | Entertainment | Sport | Magazine | The Sunday Standard