Friday, October, 13, 2017

  • Nation
  • World
  • States
  • Cities
  • Business
  • Sport
  • Entertainment
  • Galleries
  • Videos
  • Life Style
  • Specials
  • Opinions
  • All Sections  
    States Tamil Nadu Kerala Karnataka Andhra Pradesh Telangana Odisha
    Cities Chennai DelhiBengaluru Hyderabad Kochi Thiruvananthapuram
    Nation World Business Sport Cricket Football Tennis Other Education Social News
    Entertainment English Hindi Kannada Malayalam Tamil Telugu Review Galleries Videos
    Auto Life style Tech Health Travel Food Books Spirituality
    Opinions Editorials Ask Prabhu Columns Prabhu Chawla T J S George S Gurumurthy Ravi Shankar Shankkar Aiyar Shampa Dhar-Kamath Karamatullah K Ghori
    Edex Indulge Event Xpress Magazine The Sunday Standard E-paper
Home Cities Bengaluru

All DPRs of Metro Phase-II made public

By Express News Service  |   Published: 13th October 2017 03:07 AM  |  

Last Updated: 13th October 2017 07:34 AM  |   A+A A-   |  

0

Share Via Email

BENGALURU: BOWING to pressure from civic activists , Bangalore Metro Rail Corporation Limited (BMRCL) on Thursday made public the Detailed Project Report of the entire 72.1 km Phase-II, which were readied in 2011. The BMRCL Managing Director maintained that it was done only because it wanted to be transparent. Metro MD Pradeep Singh Kharola had earlier repeatedly stressed that agreements with the Delhi Metro Rail Corporation Limited, which prepared the DPRs prevented it from making them public. Asked if it was now doing it because of activists, Kharola said, “We wanted to be transparent.” Sanjeev V Dyamannavar of online forum, Praja.in, who had been requesting for the DPRs repeatedly for nearly a year through mails and public forums commended the move by BMRCL. “It is a good move. It will give information to the public on the execution of the projects.”

It will also help BMRCL carry out the projects transparently, he added. A single DPR running to 432 pages covers these four Phase-I extension lines: Reach 1: Baiyappanahalli to Whitefield (15.5 km, 14 stations); Reach 2: Mysuru Road Terminal to Kengeri (6.46 kms, 5 stations); Reach 3: Hessarghatta Cross to BIEC (3.7 km, 3 stations) and Reach 4: Puttenahalli Cross to Anjanapura Township (6.29 km, 5 stations). The commuter traffic projected for these four lines are as follows as per the report: 2021: 6.45 lakhs; 2031: 8.44 lakhs and 2041: 9.87 lakhs. The DPR also called for exemption or reimbursement for BMRCL from the State VAT tax as well as exemption from municipal taxes and electricity charges incurred in operations.

The other new line, the 18.82-km R V Road-Bommasandra Line (Reach 5) with 16 elevated stations is projected to have a ridership of 30.78 lakhs in 2021 which is estimated to zoom to 42.14 lakhs in 2041. Only the old DPR of the new line, the 21.25 km Nagawara- Gottigere corridor (Reach-6) has been uploaded, which shows the initally planned alignment through the parking lot opposite the Cantonment railway station. Asked if there was any plan to revert to the previous alignment, Kharola said, “The old DPR has been uploaded.” Activist Raj Dugar posed these two questions: How come curvature is an issue between Shivaji Nagar and Pottery Town but not between M G Road and Shivaji Nagar? How come safety became an issue betweeen Cantonment Railway station and Pottery Town and not betweeen Venkateshpura and Arabic College.

Special Metro tax

The DPR for Reach 6 also calls for the setting up of a special Metro fund at the State government level. It suggests funding to this fund through these methods: A metro tax of 2% on payrolls of all establishments having 100 employees as is been done in Western nations; green surcharge on fuel; a 50% cess on tax levied for registration of vehicles; one time green tax on existing vehicles registered in the City which could be Rs 2000 for two-wheelers and Rs 5,000 to Rs 10,000 for 4-wheelers, a 1% turnover tax on all shops, restaurants and hotels and surcharge at 10% on the luxury tax of all star hotels.

O
P
E
N

Latest

EC withholds Gujarat poll dates, Opposition miffed

Gang-rape victim kills self in Bihar

Trump to announce position on Iran deal on Friday

After US, Israel exits from UNESCO

FIFA U-17: India suffer 0-4 loss to Ghana

'9 rapes took place during Jat agitation last year'

Maharashtra: Congress sweeps Nanded civic polls

Explosion in J&K injures one

Conduct RK Nagar bypoll by Dec 31: EC to TN

Arvind Kejriwal's Aam Aadmi car stolen

Videos
Track Asia Cup- India add 2 gold, 3 silver & 3 bronze on day 2 
Dozens killed, thousands evacuated in Vietnam floods
arrow
Gallery
Aarushi Talwar, 14, was found dead with her throat slit in her bedroom in flat no. L-32 Jalvayu Vihar, Noida on the morning of May 16, 2008. The body of Hemraj, who was initially suspected of murdering her, was found in a pool of blood on the terrace of the flat, the following day. The Allahabad High Court on October 12, 2017 acquitted the dentist couple Rajesh and Nupur Talwar and quashed their conviction in the murder of their teenage daughter Aarushi and domestic help Hemraj. Here are some murder cases which are still unsolved and investigations are ongoing.
Aarushi Talwar murder, not the first to remain unsolved: Here are 7 more murder mysteries
Hugh Jackman, best known for his long-running role as Wolverine in the X-Men film series turns 49 today.  On his birthday, here are some interesting facts about the star. ( Photo | AP)
The 'Wolverine' turns 49 today: Happy Birthday Hugh Jackman 
arrow

FOLLOW US

Copyright - newindianexpress.com 2017

Dinamani | Kannada Prabha | Samakalika Malayalam | Malayalam Vaarika | Indulgexpress | Edex Live | Cinema Express | Event Xpress

Contact Us | About Us | Careers | Privacy Policy | Search | Terms of Use | Advertise With Us

Home | Nation | World | Cities | Business | Columns | Entertainment | Sport | Magazine | The Sunday Standard