Hundreds stuck inside Lucknow Metro on Day One

Press Trust of India  |  Lucknow 

Hundreds of passengers were stuck inside the Metro for over an hour due to a technical snag today, the first day of its commercial run, officials said.

There were no lights and no air-conditioning either when the train stopped near Mavaiya.


Passengers, excited about their first trip on the much- awaited metro, were stuck till a team of the Metro Rail Corporation (LMRC) came to their rescue. The passengers were taken out from the back through the emergency exit.

"There was some fault in this traction and we are working on it. All trains are plying on the other parallel track," an LMRC official said.

Chief Minister had jointly inaugurated the maiden run of the Metro with Union Home Minister yesterday. Governor Ram Naik was also present on the occasion.

The 8.5-km 'priority corridor' runs from Transport Nagar to Charbagh in the city.

(This story has not been edited by Business Standard staff and is auto-generated from a syndicated feed.)

First Published: Wed, September 06 2017. 11:28 IST