Ujaas Energy receives LoI from MOIL

Capital Market 

For a 5.5 MW solar PV plant with tracking system at mines in Madhya Pradesh

Ujaas Energy has received letter of intent from MOIL for design, engineering, procurement, supply, construction, erection, testing & Commissioning of 5.5 MW (AC) Solar PV Plants with tracking system on turnkey basis at Mines in the state of Madhya Pradesh.

This order is in addition to the LOI received in December 2016 for 5.00MW (AC) in Maharashtra.

Powered by Capital Market - Live News

(This story has not been edited by Business Standard staff and is auto-generated from a syndicated feed.)

Ujaas Energy receives LoI from MOIL

For a 5.5 MW solar PV plant with tracking system at mines in Madhya Pradesh

For a 5.5 MW solar PV plant with tracking system at mines in Madhya Pradesh

Ujaas Energy has received letter of intent from MOIL for design, engineering, procurement, supply, construction, erection, testing & Commissioning of 5.5 MW (AC) Solar PV Plants with tracking system on turnkey basis at Mines in the state of Madhya Pradesh.

This order is in addition to the LOI received in December 2016 for 5.00MW (AC) in Maharashtra.

Powered by Capital Market - Live News

(This story has not been edited by Business Standard staff and is auto-generated from a syndicated feed.)

image
Business Standard
177 22